Australia Signs For New Air Tankers | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Dec 21, 2004

Australia Signs For New Air Tankers

$1.4 Billion Deal Goes To EADS/Airbus/CASA Consortium

Australia's Defense Department has signed a $1.4 billion contract with EADS/CASA to provide the Royal Australian Air Force with five new air-to-air refueling aircraft, Defence Minister Robert Hill announced Monday.

"The new aircraft, to be known as Multi Role Tanker Transports, will be capable of refueling F/A-18, F-111, Airborne Early Warning and Control, and Joint Strike Fighter aircraft as well as having a significant strategic airlift capability," Senator Hill said.

"This contract signing is a significant step in replacing the Royal Australian Air Force's ageing Boeing 707 aircraft. The aircraft will be fitted with electronic warfare self protection equipment and training simulators will also be provided."

The new refueling aircraft will be based on the Airbus commercial A330 aircraft that is currently operated by Qantas as part of its commercial fleet.

The basic A330 aircraft will be produced in Europe with four of the five being modified and converted into MRTT aircraft by Qantas in Brisbane. Qantas will also provide the through life support for the MRTT aircraft.

"Australian industry will also be closely involved in the design work, project management, and production of aircraft components and engine parts for export," Senator Hill said.

"Work to be undertaken by Australian industry and the associated technology to be transferred to Australia is expected to exceed $500 million over the life of the MRTT aircraft."
The aircraft are scheduled to enter service in 2009. The contract schedule provides sufficient time for the aircraft to be extensively tested, facilities to be established and RAAF crews to be trained in order to ensure the MRTT capability is effectively introduced.

FMI: www.defence.gov.au

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC