EASA Certifies AW189 Full Ice Protection System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Jul 12, 2016

EASA Certifies AW189 Full Ice Protection System

Certification Clears Way For All-Weather Operations

EASA has certified the Full Ice Protection System (FIPS) for the AW189, clearing the way for the aircraft to operate in full icing conditions.

The EASA certification comes after three years of flight trials in Northern Europe and North America, during the winter months, to gather data and test the effectiveness of the system which includes electrically heated main and tail rotor blades, heated windscreens and an ice detection system. The standard AW189 helicopter already includes an engine air intake heating system. The system is fully automatic once switched on by the pilot, allowing the pilot to concentrate on other flying activities.

The FIPS is critical for operators flying in Northern Europe, Canada, Russia and the northern United States where icing conditions are common during the winter months. Almost 30 AW189s are today in service in demanding operational conditions in Europe, USA, Middle East and South East Asia.

The FIPS system is now available as an option on the AW189 and follows certification of the Limited Ice Protection System (LIPS) in September 2015. LIPS permits flight within a known and defined envelope of icing conditions provided that the capability to descend into a known band of positive temperature is available throughout the intended route.

Leonardo-Finmeccanica says the AW189 meets the very latest international regulatory safety requirements (EASA / FAA Part 29, JAR OPS 3 / EU-OPS) and is fully compliant with the latest requirements of the oil and gas producers’ helicopter operations guidelines.

The AW189 is unique in having a 50 minute ‘run-dry’ capable main gear box, exceeding current certification standards and offering unmatched safety and reliability for long range offshore operations.

(Source: Leonardo-Finmeccanica news release. Image from file)

FMI: www.leonardocompany.com

Advertisement

More News

ANN's Daily Aero-Term (12.13.25): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (12.13.25)

“We have performed extensive ground testing by comparing warm up times, full power tethered pulls, and overall temperatures in 100 degree environments against other aircraft >[...]

NTSB Final Report: Gippsland GA-8

While Taxiing To Parking The Right Landing Gear Leg Collapsed, Resulting In Substantial Damage Analysis: The pilot made a normal approach with full flaps and landed on the runway. >[...]

Classic Aero-TV: Historically Unique -- Marlin Horst's Exquisite Fairchild 71

From 2014 (YouTube Edition): Exotic Rebuild Reveals Aerial Work Of Art During EAA AirVenture 2014, ANN's Michael Maya Charles took the time to get a history lesson about a great ai>[...]

Airborne 12.12.25: Global 8000, Korea Pilot Honors, AV-30 Update

Also: Project Talon, McFarlane Acquisition, Sky-Tec Service, JPL Earth Helo Tests Bombardier has earned a round of applause from the business aviation community, celebrating the fo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC