NASA Awards Commercial Crew Contracts | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Wed, Dec 12, 2012

NASA Awards Commercial Crew Contracts

Next Step Toward Domestic Launch Program

NASA announced Monday that it has selected three companies to conduct activities under contracts that will enable future certification of commercial spacecraft as safe to carry humans to the International Space Station. Advances made by these American companies during the first contract phase known as the certification products contracts (CPC) will begin the process of ensuring integrated crew transportation systems will meet agency safety requirements and standards to launch American astronauts to the International Space Station from the United States, which the agency says will end its reliance on Russia for such transportation services. The second phase of certification will result in a separately competed contract.

CPC contractors are Boeing, which was awarded $9,993,000; Sierra Nevada Corporation Space System of Louisville, CO, which received $10,000,000, and SpaceX, which is getting $9,589,525. "These contracts represent important progress in restoring human spaceflight capabilities to the United States," said Phil McAlister, director of the Commercial Spaceflight Development Division at NASA Headquarters in Washington. "NASA and its industry partners are committed to the goal of safely and cost-effectively launching astronauts from home within the next five years."

During the Phase 1 CPC contracts, from Jan. 22, 2013 through May 30, 2014, the companies will work with NASA's Commercial Crew Program (CCP) to discuss and develop products to implement the agency's flight safety and performance requirements. This includes implementation across all aspects of the space system, including the spacecraft, launch vehicle, and ground and mission operations. Under the contract, a certification plan will be developed to achieve safe, crewed missions to the space station. This includes data that will result in developing engineering standards, tests and analyses of the crew transportation systems design. "I congratulate the three companies for their selection," said Ed Mango, CCP manager at NASA's Kennedy Space Center in Florida. "This is the program's first major, fixed-price contract. The effort will bring space system designs within NASA's safety and performance expectations for future flights to the International Space Station."

The second phase of the certification contract, expected to begin in mid-2014, will involve a full and open competition. It will include the final development, testing and verifications necessary to allow crewed demonstration flights to the space station. NASA is facilitating the development of U.S. commercial crew space transportation capabilities with the goal of achieving safe, reliable and cost-effective access to and from low-Earth orbit for potential future government and commercial customers.

(Pictured top: Boeing CTS100. Bottom left; Sierra Nevada Corp Dreamchaser, right; SpaceX Dragon)

FMI: www.nasa.gov/commercialcrew


Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

NTSB Final Report: Capella Aircraft Corp FW1C50

Pilot Reported That He Was Unfamiliar With The Single Seat Amateur-Built Airplane And His Intent Was To Perform High-Speed Taxi Testing Analysis: The pilot reported that he was unf>[...]

Classic Aero-TV: Timber Tiger Touts Curtiss Jenny Replicas

From 2023 (YouTube Edition): First Kits to Ship October 2023 Having formerly resurrected the storied shape of the Ryan ST—in effigy, anyway—Montrose, Colorado-based Tim>[...]

ANN's Daily Aero-Term (07.04.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC