AD: Eurocopter Deutschland GmbH Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jun 26, 2012

AD: Eurocopter Deutschland GmbH Helicopters

AD NUMBER: 2012-11-02

PRODUCT: Certain Eurocopter Deutschland GmbH (ECD) Model EC135 helicopters.
SUBJECT: Airworthiness Directive 2012-11-02
ACTION: Final rule; request for comments.

SUMMARY: The FAA is adopting a new airworthiness directive (AD) that supersedes an existing Emergency Airworthiness Directive (EAD) for the products listed above. The existing EAD, which was previously sent to all known U.S. owners and operators of ECD Model EC135 helicopters and not made generally effective by publication in the Federal Register, currently requires inspecting the ring frame between the rear structure tube (tailboom) and the tail rotor fenestron housing (fenestron housing) for a crack before the first flight of each day and replacing any cracked ring frame with an airworthy ring frame. Since we issued that EAD, we have determined that a pre-flight pilot check in conjunction with a recurring 25-hour inspection is sufficient for determining the airworthiness of the ring frame. Additionally, ECD has developed a modification that is terminating action for the requirements of that EAD. This superseding AD revises the inspection requirements of the EAD to allow an owner/operator to perform the pre-flight pilot check, adds a recurring inspection of the ring frame, and allows for installation of a ring frame reinforcement as an optional terminating action for the AD requirements.

The actions are intended to detect a crack in the ring frame which could result in loss of the fenestron structure and subsequent loss of control of the helicopter.

DATES: This AD becomes effective July 10, 2012. Comments on this AD are due by August 24, 2012.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC