Southwest Flying Planes Previously Grounded Due To Missed Inspections | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Fri, Feb 27, 2015

Southwest Flying Planes Previously Grounded Due To Missed Inspections

But Checks Must Be Completed Within Five Days

The clock is ticking on 128 Boeing 737 airliners flown by Southwest after it was revealed that they had missed inspections required by the FAA.

The planes had initially been grounded. Southwest said in a Tweet that "A select number of aircraft have been removed from service for maintenance checks, resulting in minimal delays."

The airline on Wednesday posted a statement on its website said that the FAA had approved a plan to complete inspections within five days.

"On Tuesday, Southwest Airlines discovered a required maintenance check on the standby hydraulic system, which serves as a back-up to the primary hydraulic systems, was overdue on 128 Boeing 737-700 aircraft," the statement said. "Southwest immediately and voluntarily removed the affected aircraft from service, initiated maintenance checks, disclosed the matter to the FAA, and developed an action plan to complete all overdue checks. Late Tuesday evening, the FAA granted Southwest approval to continue operating the aircraft for a maximum of five days as the checks are completed. Approximately 80 cancellations occurred Tuesday as Southwest awaited FAA's response."

"The Safety of Customers and Employees is Southwest's highest priority and the airline is working quickly to resolve the situation."

The airline said the flight schedule was expected to be nearly normal by Wednesday as the remaining checks were completed.

(Image from file)

FMI: www.southwest.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC