AAR Receives Order For 30 Lockheed C-130 Cargo Systems | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Nov 28, 2010

AAR Receives Order For 30 Lockheed C-130 Cargo Systems

Equipment Facilitates Loading, Delivery Of Military Cargo

The Cargo Systems division of AAR has received a purchase order to manufacture and supply C-130 cargo handling systems and spares components for thirty Lockheed C-130 Hercules aircraft.

The AAR cargo systems facilitate the loading, securing, unloading and in-flight release of military-style pallets, including low-altitude parachute extractions. AAR has been manufacturing C-130 cargo systems since 1968 and has delivered 1,280 of the specially-designed systems for the worldwide fleet of C-130 aircraft.

In a Monday news release, Vin Misciagna, Vice President and General Manager of AAR Cargo Systems, said, "Our experience and capabilities with the C-130 enable us to provide a cost-effective, high-value solution for the conversion and ongoing operation of the C-130 fleet."


C-130 File Photo

AAR received the purchase order from B&G Industries, LLC, a provider of Military and Commercial aircraft repair and modification services to both military and commercial customers. B&G specializes in the repair of major structural damage, mission specific modifications, and military depot-level maintenance. B&G Industries also provides full NDT services, performs heavy checks and avionics installations, and offers precision manufacturing services.

FMI: www.aarcorp.com, www.bgiaviation.com

Advertisement

More News

NTSB Final Report: Piper PA-44-180

While On The Base Leg Of The Airport Traffic Pattern The Right Main Landing Gear Did Not Fully Extend Analysis: Both pilots reported that after performing airwork they returned to >[...]

Classic Aero-TV: The Bizarre Universe of Klyde Morris Cartoons

From 2023 (YouTube Edition): Putting the ANT in Antihero A Beech Starship speeds along at altitude. “Deflectors on!” a voice from within the aircraft cries. “Look>[...]

ANN's Daily Aero-Term (11.09.25): Minimum Friction Level

Minimum Friction Level The friction level specified in AC 150/5320-12, Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces, that represents the m>[...]

Aero-News: Quote of the Day (11.09.25)

“Beginning this aircraft subsystem testing is the culmination of more than a decade of focused engineering and certification refinements. This is the moment where our intende>[...]

Classic Aero-TV: Falling for Para-Phernalia’s Softie Emergency Parachutes

From 2023 (YouTube Edition): The Best Option for A Pilots’ Worst Days Since its 1979 founding, Para-Phernalia, Inc. has designed and manufactured the Softie line of pilot eme>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC