AD: Airbus Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.27.25

AirborneNextGen-
10.28.25

Airborne-Unlimited-10.29.25

Airborne-Unlimited-10.30.25

AirborneUnlimited-10.17.25

Thu, Mar 15, 2018

AD: Airbus Helicopters

AD NUMBER: 2018-05-09

PRODUCT: Airbus Helicopters Model AS332C, AS332C1, AS332L, and AS332L1 helicopters.

ACTION: Final Rule.

SUMMARY: This AD requires inspecting the tail rotor (T/R) flapping hinge link (hinge) and reporting the results.

This AD is prompted by a report of a damaged flapping hinge link.

DATES: This AD becomes effective March 26, 2018.

COST: The FAA estimates that this AD affects 20 helicopters of U.S. Registry. The FAA estimates that operators may incur the following costs in order to comply with this AD:

  • At an average labor rate of $85 per hour, inspecting 5 T/R hinges will require 8 hours, and required materials cost would be minimal, for a cost per helicopter of $680 and a cost of $13,600 to the U.S. fleet.
  • Reporting the inspection findings would require about 30 minutes, for a cost per helicopter of $43 and a cost of $860 to the U.S. fleet. If required, dye-penetrant inspecting the spindle bolt or inner ring would require about 1 hour, and required materials cost would be minimal, for a cost per helicopter of $85. If required, replacing a spindle bolt would require about 1 hour, and required parts would cost $625, for a cost per helicopter of $710.
  • If required, replacing the bearing race would require about 1 hour, and required parts would cost $585, for a cost per helicopter of $670.
  • If required, replacing the inner ring would require about 1 hour, and required parts would cost $1,986, for a cost per helicopter of $2,071.
FMI: AD

Advertisement

More News

Klyde Morris (10.27.25)

It Does Indeed Work Every Time, Klyde FMI: www.klydemorris.com>[...]

Airborne 10.27.25: MOSAIC Phase 1, Katana Returns, MOSAIC Town Hall!

Also: Orlando Air Show Cancelled, ATC Staffing Shortages, CH-47F Block II Chinooks, Sustainable $$ More than a decade of hard work, legal setbacks, and community advocacy has final>[...]

Airborne-NextGen 10.28.25: Police Drones, Nat'l Parks v UAVs, MOSAIC Phase 1

Also: MOSAIC Town Hall, Lockheed Martin Venus, Electric Aircraft Cooling, Korea Taps Archer The Miami-Dade Sheriff’s Office is at the front end of a year-long AI policing exp>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

NTSB Final Report: Airbus A321-271N (A1); Cessna 172N (A2)

The Local Controller’s Poor Judgment In Prioritization Of Their Ground Traffic Ahead Of Their Airborne Traffic Analysis: Hawaiian Airlines flight 70 (HAL70), N2165HA, an Airb>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC