U.S. Army Awards LMC Apache Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.02.24

Airborne-NextGen-12.03.24

Airborne-Unlimited-12.04.24

Airborne Flt Training-12.05.24

Airborne-Unlimited-12.06.24

Sun, Aug 16, 2015

U.S. Army Awards LMC Apache Contract

Will Upgrade Helicopter Targeting And Pilotage System

The U.S. Army has awarded Lockheed Martin a $21.7 million Lot 4 follow-on contract to continue production of the Modernized Day Sensor Assembly (M-DSA) for the AH-64E Apache attack helicopter.

This first phase of upgrades to modernize the Apache’s Day Sensor Assembly includes producing Modernized Laser Rangefinder Designator (M-LRFD) kits. M-LRFD is the principal targeting aid for the Apache, enabling pilots to designate targets and establish target range for accurate weapon engagement. M-DSA is an upgrade to the Apache’s targeting and pilotage system, or Modernized Target Acquisition Designation Sight/Pilot Night Vision Sensor (M-TADS/PNVS).
 
A total of $21.7 million was obligated to Lockheed Martin through this Lot 4 contract award; the total value is not-to-exceed $50.9 million. Lockheed Martin is on contract to produce and deliver 786 M-LRFD kits for the U.S. Army and international customers. More than 200 kits have been delivered to the U.S. Army to date.
 
“We are currently fielding laser kits as part of the M-DSA Phase 1 upgrade and are on track to equip approximately seven Apache battalions a year,” said Matt Hoffman, M-TADS/PNVS director at Lockheed Martin Missiles and Fire Control.
 
In addition, Lockheed Martin has already qualified M-DSA Phase 2 upgrades and is ready to transition into production. Phase 2 M-DSA upgrades allow Apache pilots to see high-resolution, near infrared and color imagery on cockpit displays. Phase 2 upgrades also include a new laser pointer marker and a multi-mode laser with eye-safe lasing capability. These improvements allow for better coordination with ground troops and safe flight in urban environments and during training exercises.

(Image from file)

FMI: www.lockheedmartin.com

Advertisement

More News

NTSB Final Report: Michael G Darby DARD 1

After Landing He Realized He Had Misidentified The Runway And Landed In Softer Snow Analysis: The pilot reported that during approach to the snow-covered runway in flat light condi>[...]

ANN's Daily Aero-Term (12.04.24): Arresting System

Arresting System A safety device consisting of two major components, namely, engaging or catching devices and energy absorption devices for the purpose of arresting both tailhook a>[...]

Aero-News: Quote of the Day (12.04.24)

“We learned a great deal in the process, such as greater coding skills, soldering techniques, and video editing skills...” Source: Cuyahoga County Team Captain John Ana>[...]

Airborne Affordable Flyers 11.26.24: BushCat's Back!, LODA Update, DRL Miami

Also: Van Celebrates 85th, Trio Pro Pilot Autopilot, Joby on MSFS24, Sonex Transition The BushCat was manufactured in South Africa by SkyReach beginning in 2014, selling its first >[...]

Airborne 12.02.24: Electra FG EIS, Prez Osprey Problems, Starship Wants 25

Also: EAA Ray Foundation, MagniX Records, Ruko U11MINI Drone, RCAF PC-21s Elektra Solar recently put the first aircraft from its Elektra Trainer Fixed-Gear (FG) family into service>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC