U.S. Army Awards LMC Apache Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Aug 16, 2015

U.S. Army Awards LMC Apache Contract

Will Upgrade Helicopter Targeting And Pilotage System

The U.S. Army has awarded Lockheed Martin a $21.7 million Lot 4 follow-on contract to continue production of the Modernized Day Sensor Assembly (M-DSA) for the AH-64E Apache attack helicopter.

This first phase of upgrades to modernize the Apache’s Day Sensor Assembly includes producing Modernized Laser Rangefinder Designator (M-LRFD) kits. M-LRFD is the principal targeting aid for the Apache, enabling pilots to designate targets and establish target range for accurate weapon engagement. M-DSA is an upgrade to the Apache’s targeting and pilotage system, or Modernized Target Acquisition Designation Sight/Pilot Night Vision Sensor (M-TADS/PNVS).
 
A total of $21.7 million was obligated to Lockheed Martin through this Lot 4 contract award; the total value is not-to-exceed $50.9 million. Lockheed Martin is on contract to produce and deliver 786 M-LRFD kits for the U.S. Army and international customers. More than 200 kits have been delivered to the U.S. Army to date.
 
“We are currently fielding laser kits as part of the M-DSA Phase 1 upgrade and are on track to equip approximately seven Apache battalions a year,” said Matt Hoffman, M-TADS/PNVS director at Lockheed Martin Missiles and Fire Control.
 
In addition, Lockheed Martin has already qualified M-DSA Phase 2 upgrades and is ready to transition into production. Phase 2 M-DSA upgrades allow Apache pilots to see high-resolution, near infrared and color imagery on cockpit displays. Phase 2 upgrades also include a new laser pointer marker and a multi-mode laser with eye-safe lasing capability. These improvements allow for better coordination with ground troops and safe flight in urban environments and during training exercises.

(Image from file)

FMI: www.lockheedmartin.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC