Boeing 787 Dreamliner Program Completes Static Test Analysis, Gauntlet Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Dec 12, 2009

Boeing 787 Dreamliner Program Completes Static Test Analysis, Gauntlet Tests

First Flight "Window" Opens December 15th

Boeing completed the review and analysis of the static test that was conducted Nov. 30 on Thursday, validating the side-of-body modification made to the 787 Dreamliner. "I am happy to report that the program has validated the airplane structure for the 787 Dreamliner," said Scott Fancher, vice president and general manager of the 787 program.

Fancher also reported that the 787 team has completed final gauntlet testing on the first airplane. Testing lasted for just two days because only improvements made earlier this year during previous testing had to be examined. "We are very pleased with the results of this final functional testing. With the successful completion of static testing and this functional testing, our focus now moves to first flight."

During the test on the 787 Dreamliner static test airframe, the wing and trailing edges of the airframe were subjected to their limit load -- the highest loads expected to be seen in service. The limit-load test was required to clear the airplane for first flight. Boeing's test strategy is to conduct all limit-load tests and analyze data before conducting the ultimate load series, which is required for certification and will be conducted next year.

Boeing announced June 23 that it was necessary to reinforce an area of structure at the side-of-body section of the 787. The modification entails installing new fittings at 34 stringer locations within the joint where the wing attaches to the fuselage. The 787 team has completed modifications on the first three flight-test airplanes and the full-scale static test airplane.

First flight of the 787 Dreamliner is expected to occur after final flight readiness reviews, receipt of documentation from the U.S. Federal Aviation Administration and taxi testing. Both taxi testing and first flight are subject to weather conditions.

"We are pleased with the pace of progress in preparing to enter our flight test program," said Fancher.

So we know what you're thinking. "Just go fly the darn thing already!" Well, Boeing says on it's website that the "window" for the first flight opens on December 15th. "This date is dependent on final internal reviews, taxi tests and receiving the final experimental ticket from the U.S. Federal Aviation Administration," the company said in a media notice.

FMI: www.boeing.com

Advertisement

More News

Classic Aero-TV: Extra Aircraft Announces the Extra 330SX

From 2023 (YouTube Edition): An Even Faster Rolling Extra! Jim Campbell joined General Manager of Extra Aircraft Duncan Koerbel at AirVenture 2023 to talk about what’s up and>[...]

Aero-News: Quote of the Day (11.15.25)

“Receiving our Permit to Fly and starting Phase 4 marks a defining moment for Vertical Aerospace. Our team has spent months verifying every core system under close regulatory>[...]

ANN's Daily Aero-Term (11.15.25): Middle Marker

Middle Marker A marker beacon that defines a point along the glideslope of an ILS normally located at or near the point of decision height (ILS Category I). It is keyed to transmit>[...]

NTSB Final Report: Lancair 320

The Experienced Pilot Chose To Operate In Instrument Meteorological Conditions Without An Instrument Flight Rules Clearance Analysis: The airplane was operated on a personal cross->[...]

Airborne 11.14.25: Last DC-8 Retires, Boeing Recovery, Teeny Trig TXP

Also: ATI Strike Prep, Spirit Still Troubled, New CubCrafters Dealership, A-29 Super Tucano Samaritan’s Purse is officially moving its historic Douglas DC-8 cargo jet into re>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC