F-35 Ground Operations Resume | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Aug 12, 2011

F-35 Ground Operations Resume

First Step In Return To Flight Testing

The F-35 Joint Program Office authorized a return to ground operations for the F-35 developmental test (DT) aircraft today. This is the first step in returning the F-35 fleet to full flight operations. A precautionary suspension of both ground and flight operations for the program was issued Aug. 3.

File Photo

An Air Force Safety Investigation Board convened Aug. 4 and is reviewing the circumstances that led to the failure of the Integrated Power Package (IPP) aboard AF-4, an F-35A conventional takeoff and landing variant, assigned to Edwards AFB, Calif. The F-35's IPP is a turbo-machine that provides power to start the engine and generates cooling for the aircraft.
 
While the investigation continues, government and contractor engineering teams, after reviewing initial data, determined the fleet could safely resume DT ground operations. Preliminary root cause indicates that a control valve did not function properly which led to the IPP failure. Monitoring of this valve is the mitigating action to allow DT ground operations. The F-35 team is revising ground monitoring procedures to ensure testing involving the IPP takes place safely.
 
While initiating DT ground operations is a major step for the F-35 fleet returning to flight, further reviews are required prior to lifting the suspension of flight operations for the 20 F-35s currently in flying status. These aircraft are part of the System Development and Demonstration (SDD) and Low Rate Initial Production fleet.
 
The determinations of root cause and potential mitigating actions have the highest priority of the F-35 Team. The impact to SDD execution and production operations is being assessed. The program has built margin into the test schedule to accommodate these kinds of incidents that occur in the development effort. Periodic updates concerning this situation will be released as warranted.

FMI: www.f35.com

Advertisement

More News

Airborne 11.24.25: ANN's 30th!, Starship’s V3 Booster Boom, Earhart Records

Also: 1st-Ever Space Crime Was a Fraud, IAE Buys Diamonds, Kennon Bows Out, Perseverance Rover An interesting moment came about this past Sunday as ANN CEO, Jim Campbell, noted tha>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: DeltaHawk Aero Engine Defies Convention

From 2023 (YouTube Edition): Deviation from the Historical Mean Racine, Wisconsin-based DeltaHawk is a privately-held manufacturer of reciprocating engines for aircraft and hybrid >[...]

NTSB Final Report: Glasair GlaStar

Smoke Began Entering The Cockpit During The Landing Flare, And Then The Pilot Noticed Flames On The Right Side Of The Airplane Analysis: The pilot reported that about 30 minutes in>[...]

ANN's Daily Aero-Term (11.22.25): Remote Communications Outlet (RCO)

Remote Communications Outlet (RCO) An unmanned communications facility remotely controlled by air traffic personnel. RCOs serve FSSs. Remote Transmitter/Receivers (RTR) serve termi>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC