New Tower To Be Built At Canada's Waterloo International Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Jun 09, 2015

New Tower To Be Built At Canada's Waterloo International Airport

NAV CANADA To Build The New Structure, Replacing 45-Year-Old Facility

A new air traffic control tower will be built by NAV CANADA at the Region of Waterloo International Airport. The new structure will replace the existing tower built over 45 years ago. Work is set to begin this month and is anticipated to be completed by the summer 2017.

"The new tower will be significantly taller than what we have today. The added height will improve controllers' sightlines to all the airport's runways, taxiways and aprons," says Rudy Kellar, NAV CANADA Executive Vice President, Service Delivery. "The tower cab will be larger and provide controllers with a 360-degree view of the airfield."

At 64 feet tall, the new tower will be almost 16 feet taller than the present structure. The larger cab will expand the controllers' workspace to 3345 square feet. The four story building will have an elevator.

"This new facility will be well suited for the existing traffic and will meet the future needs of our airport," said said Ken Seiling, Waterloo Regional Chair.

"The Region of Waterloo International Airport is an important gateway for the region and I am pleased that NAV CANADA is making this significant investment in the airport," says the Honourable Lisa Raitt, Minister of Transport. "These types of investments in our aviation infrastructure will benefit both residents and businesses in the area."

"The current tower was built in 1969," notes Kellar. "At that time it was situated near the centre of the airport. Since then, runway 08/26 has been extended a further 3,300 feet to the east which put the centre well east of the tower's location."

The new facility will also feature much needed office space, a conference room, a fitness room, a quiet lounge, a lunch room and a training classroom. For controllers working in the cab there will be three new ergonomically designed consoles.

(Artists rendering provided by NAV CANADA)

FMI: www.navcanada.ca

Advertisement

More News

Airborne 07.02.25: TikToker Arrested, Vietnam A/L Ground Hit, ATC Modernization

Also: Outlaw Prop 4 Mooney, Ready 4 Duty, Ukrainian F-16 Pilot Lost, Blue Origin Flt On his journey to become the first pilot to land solo on all seven continents, 19-year-old Etha>[...]

Airborne Affordable Flyers 07.03.25: Sonex HW, BlackShape Gabriel, PRA Fly-In 25

Also: DarkAero Update, Electric Aircraft Symposium, Updated Instructor Guide, OSH Homebuilts Celebrate The long-awaited Sonex High Wing prototype has flown... the Sonex gang tells >[...]

ANN's Daily Aero-Term (07.07.25): Discrete Code

Discrete Code As used in the Air Traffic Control Radar Beacon System (ATCRBS), any one of the 4096 selectable Mode 3/A aircraft transponder codes except those ending in zero zero; >[...]

Classic Aero-TV: DeltaHawk Aero Engine Defies Convention

From 2023 (YouTube Edition): Deviation from the Historical Mean Racine, Wisconsin-based DeltaHawk is a privately-held manufacturer of reciprocating engines for aircraft and hybrid >[...]

ANN's Daily Aero-Linx (07.07.25)

Aero Linx: Formation and Safety Team (F.A.S.T.), USA The Formation and Safety Team (FAST) is a worldwide, educational organization dedicated to teaching safe formation flying in Wa>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC