P-8A Passes Initial Operational Test And Evaluation | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.21.25

Airborne-NextGen-04.22.25

AirborneUnlimited-04.23.25

Airborne-FltTraining-04.24.25

AirborneUnlimited-04.25.25

Wed, Jul 10, 2013

P-8A Passes Initial Operational Test And Evaluation

Key Milestone Will Influence Full-Rate Production Decision

After an extensive testing period, the U.S. Navy announced July 1 in an Initial Operational Test and Evaluation report that its new patrol and reconnaissance aircraft, P-8A Poseidon, was found “operationally effective, operationally suitable, and ready for fleet introduction.”

“This milestone and accomplishment is possible due to the great team of individuals who worked diligently and meticulously in making this aircraft the best choice to replace the Navy’s current workhorse, the P-3C Orion,” said Capt. Scott Dillon, Maritime Patrol and Reconnaissance Aircraft Program Office (PMA-290) program manager. “It is a great day for the Navy and the fleet. We are proud to add the P-8 to the Navy’s weapons inventory and the deployment cycle later this year.”

This announcement of completing IOT&E follows another major program milestone last month, the successful firing of the Harpoon from the P-8A, which resulted in a successful target strike.
 
“On June 24, completing just one practice run at the Point Mugu Sea Test Range, a P-8A Poseidon from Pax River achieved a program milestone after six minutes of flight time,” Dillon said. “The P-8A successfully launched a Harpoon AGM-84D Block IC missile on the first hot run scoring a direct hit run on a Low Cost Modular Target. This flight test, along with past tests, demonstrates the P-8’s operational effectiveness and overall mission capabilities.”
 
The successful completion of the initial operational testing period was a key milestone that will inform the full-rate production decision. With the program passing IOT&E, the P-8A program continues to be on track for an initial operational deployment this winter when the first P-8A squadron will deploy with P-3 and EP-3 squadrons.
 
To date, nine low rate initial production aircraft have been delivered to the fleet and six test aircraft have been delivered to NAVAIR. According to the program of record, the Navy plans on purchasing 117 P-8As aircraft.

(U.S. Navy image.)

FMI: www.navair.navy.mil

Advertisement

More News

Aero-News: Quote of the Day (04.28.25)

“While legendary World War II aircraft such as the Corsair and P-51 Mustang still were widely flown at the start of the Korean War in 1950, a new age of jets rapidly came to >[...]

ANN's Daily Aero-Term (04.28.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

ANN's Daily Aero-Linx (04.28.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

Airborne-Flight Training 04.24.25: GA Refocused, Seminole/Epic, WestJet v TFWP

Also: Cal Poly Aviation Club, $$un Country, Arkansas Aviation Academy, Teamsters Local 2118 In response to two recent general aviation accidents that made national headlines, more >[...]

Aero-News: Quote of the Day (04.29.25)

“The FAA is tasked with ensuring our skies are safe, and they do a great job at it, but there is something about the system that is holding up the medical process. Obviously,>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC