AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Apr 19, 2018

AD: The Boeing Company Airplanes

AD NUMBER: 2018-07-20

PRODUCT: Certain Boeing Model MD-11 and MD-11F airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2014-03-07, which applied to the aircraft listed above.

AD 2014-03-07 required inspecting certain locations of the wire bundles of the center upper auxiliary fuel tank for damage, and corrective action if necessary. AD 2014-03-07 also required installing nonmetallic barrier/shield sleeving, new clamps, new attaching hardware, and a new extruded channel.

This AD adds certain inspections and expands the applicability. This AD was prompted by the determination that it is necessary to require an inspection of the wire bundles for damage at certain center upper auxiliary fuel tank locations on certain airplanes.

DATES: This AD is effective May 21, 2018.

COST: The FAA estimates that this AD affects 125 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Inspection/installation [retained actions from AD 2009-26-16, Amendment 39-16155 (74 FR 69249, December 31, 2009)]: $29,988 to $43,475 per inspection cycle per aircraft for parts and labor.
  • Inspection/installation for Groups 1, 2, and 5, all Configuration 2 airplanes (retained actions from AD 2014-03-07): Up to $6,931 per aircraft for parts and labor.
  • Inspection/installation for Groups 1, 2, and 5, all Configuration 2 airplanes (new action): Up to $340 per aircraft for parts and labor.
  • Inspection/installation for Line Number 579 (new action): $28,345 per aircraft for parts and labor.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (11.16.25): NonApproach Control Tower

NonApproach Control Tower Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach co>[...]

Aero-News: Quote of the Day (11.16.25)

“This shutdown inflicted real damage. Beyond disrupting operations and adding risk into the aviation system… it hindered essential career growth opportunities and stal>[...]

ANN's Daily Aero-Linx (11.16.25)

Aero Linx: The Mooney Mite Site Dedicated to the Mooney M-18 Mite, "The Most Personal Airplane," and to supporting Mite owners everywhere. The Mooney M-18 Mite is a single-place, l>[...]

NTSB Final Report: Vans Aircraft Inc RV-12

Pilot’s Improper Installation Of The Control Stick Pushrod Assemblies, Which Resulted In Separation Of The Left Pushrod And A Total Loss Of Roll Control Analysis: While retur>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC