Boeing On Schedule To Deliver World’s 1st All-Electric Satellites | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Sun, Mar 30, 2014

Boeing On Schedule To Deliver World’s 1st All-Electric Satellites

Primary Structures Completed For Two Boeing 702SP Spacecraft For ABS And Eutelsat

Boeing is on track to deliver the world's first all-electric propulsion satellites in late 2014 or early 2015 as it has met key production milestones on its initial 702SP (small platform) satellites, the company said in a news release Monday.

Boeing recently completed static qualification testing, verification and assembly of the primary structures for 702SP inaugural customers ABS and Eutelsat, with the spacecraft scheduled to be launched as a pair in a stacked configuration. The initial contract was signed in 2012 between Boeing and Satmex. Eutelsat acquired Satmex in January 2014.

"We will be first to launch a commercial all-electric satellite, providing customers new flexibility and next-generation technology for increased performance," said Craig Cooning, vice president and general manager of Boeing Space & Intelligence Systems. "The all-electric propulsion design gives customers more affordable launch options and the ability to nearly double payload capacity."

Boeing is building two pairs of 702SP satellites under a joint four-satellite agreement with ABS and Eutelsat. Production on the 702SP satellites began in 2013, after the spacecraft passed its critical design review.

(Image provided by Boeing)

FMI: www.boeing.com

 


Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC