Fire Scout Team Takes Steps To Arm Unmanned Helicopter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Sun, Mar 25, 2012

Fire Scout Team Takes Steps To Arm Unmanned Helicopter

Navy Requests Weaponized MQ-8B, First For The Service

The U.S. Navy for the first time has reqested that one of its unmanned aircraft be configured to carry weapons. The Navy plans to arm the MQ-8B Fire Scout with a laser-guided rocket, the Advanced Precision Kill Weapon System (APKWS), in just 18 months.

Typically, this type of development would take two to three years at a minimum, according to Jeremy Moore, Fire Scout weapons system integration lead. Arming the Fire Scout with a guided rocket will enable the fleet to engage hostile threats with the Fire Scout independent of air support from carrier or shore-based aircraft. This capability will keep the warfighter out of harm’s way, he said.

The Fire Scout team and NAVAIR’s structures rotary-wing division personnel conducted the first of a series of tests March 7 on the newly installed hardware, which will gauge how the system will operate in the shipboard environment.
 
“This is the very first weaponization program on this aircraft,” said Moore. Part of the Rapid Deployment Capability (RDC) acquisition process, “it was identified by the fleet as an urgent need for joint forces, so we are pressing forward as hard as we can to get it out there.”
 
Bill McCartney, Fire Scout’s Air Vehicle flight test lead, said the weaponization of any aircraft is an intricate process, particularly it in this case since it is the first time the Navy will arm an unmanned aircraft. “We had a very tight timeline to conduct trade studies and complete design reviews,” McCartney said. “Now, we are starting to execute tests, and there is little time in the schedule for repeats.”
 
The team planned this test event to get an early look at the new hardware design installed on the aircraft, allowing them to identify any issues before beginning ground and flight tests later this year. Ground and flight tests will be conducted by Naval Air Warfare Center’s Aircraft Division and Weapons Division personnel at Webster Field and China Lake, Calif., with support from NAVAIR, Naval Sea Systems Command and industry partners.
 
“This is the first stepping stone,” Moore said. “We are trying to build in the capability to add on additional weapons in the future.” (Photo provided by NAVAIR)

FMI: www.navy.mil

Advertisement

More News

Oshkosh Memories: An Aero-News Stringer Perspective

From 2021: The Inside Skinny On What Being An ANN Oshkosh Stringer Is All About By ANN Senior Stringer Extraordinare, Gene Yarbrough The annual gathering at Oshkosh is a right of p>[...]

NTSB Prelim: Piper PA32RT

Video Showed That During The Takeoff, The Nose Baggage Door Was Open On May 10, 2025, about 0935 eastern daylight time, a Piper PA-32RT-300, N30689, was destroyed when it was invol>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

Aero-News: Quote of the Day (05.28.25)

"I think what is key, we have offered a bonus to air traffic controllers who are eligible to retire. We are going to pay them a 20% bonus on their salary to stay longer. Don't reti>[...]

ANN's Daily Aero-Term (05.28.25): Pilot Briefing

Aero Linx: Pilot Briefing The gathering, translation, interpretation, and summarization of weather and aeronautical information into a form usable by the pilot or flight supervisor>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC