Navy EA-6B Fighting Fatigue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Wed, Nov 05, 2003

Navy EA-6B Fighting Fatigue

19 Down (Temporarily), 24 To Go

Naval Air Systems Command (NAVAIR) removed 19 EA-6B "Prowlers" from service Sept. 23, for repairs and maintenance due to structural fatigue damage, with 24 additional aircraft to follow within two months.

The reduction in active aircraft inventory is the result of recently completed engineering evaluations of structural health and reduced risk-to-tolerance commensurate with world events. The Navy continues to optimize available EA-6B resources to best support current operational and training requirements, while keeping crew-safety the top priority.

The number of Prowlers will be reduced from 95 to 71 until spring, primarily to induct high fatigue aircraft with Wing Center Sections and Outer Wing Panels issues into depot maintenance for wing replacement.

Currently, the EA-6B is the most capable and only tactical electronic attack aircraft in DoD inventory. The Navy has worked very closely with other services to balance joint and naval operational requirements against available EA-6B aircraft. According to NAVAIR officials, the road ahead involves the carefully designed disestablishment of one of the Navy's four expeditionary squadrons, which dually provides an opportunity to achieve force reductions, while still fulfilling all joint and naval requirements.

The new breakdown of squadrons would include Navy Carrier Squadrons (30 aircraft), Navy Expeditionary Squadrons (9 aircraft), Marine Expeditionary Squadrons (15), Fleet Replacement (13), Navy Reserve (2) and Testing (2 aircraft). All of these initiatives are to help sustain the EA-6B fleet until the introduction of the highly anticipated EA-18G beginning 2009.

The EA-6B could return to pre-Operation Iraqi Freedom numbers in approximately 24 months. The Navy remains committed to providing electronic warfare capability to combatant commanders to support ongoing real-world requirements. [ANN Thanks Journalist 2nd Class Kimberly Rodgers, Navy News Service, for the report]

FMI: www.navy.mil. www.navair.mil

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

ANN's Daily Aero-Linx (07.03.25)

Aero Linx: Colorado Pilots Association (CPA) Colorado Pilots Association was incorporated as a Colorado Nonprofit Corporation in 1972. It is a statewide organization with over 700 >[...]

ANN's Daily Aero-Term (07.03.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC