Blackcomb Helicopters Opens Powerline Training Facility | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Fri, Apr 19, 2024

Blackcomb Helicopters Opens Powerline Training Facility

Mission-Driven Helo Playground Provides Realism in Training

Blackcomb Helicopters announced a new addition to its Advanced Training Center in the Powerline Training Facility, a skill-building emporium of structures suited to proper SAR operations.

The location in Pemberton, British Columbia, "stands as a testament to Blackcomb Helicopters’ commitment to excellence in utility operations, offering a controlled and safe environment where crew can hone their abilities and ensure precision performance in the field." Powerline is equipped with a double circuit, 138KV monopole with five structures; a self-supporting lattice tower; a single circuit, 230 KV H-frame with four structures; a practice H-frame structure; 2 culverts for pole sets; and plenty of space to maneuver.

With everything considered, Pemberton can now offer helicopter training in Class D hoist/winch ops, Class D Fixed Line procedures, pole setting, timber removal and installation, ice removal, tower reinforcement, picking conductors, cross-arm changes, installing conductor carts, marker ball placement, spacer damper replacement/installation, sock line pulling, and glass changes. That's a pretty solid portfolio for those who get a lot done in the blue collar side of flying, and not the most common training around.

“Our goal with the Powerline Training Facility is to enhance safety and proficiency,” said Andrew Bradley, business development manager at Blackcomb Helicopters. “Previously, our teams encountered challenging environments whilst on site. Now, this facility allows them to practice and perfect specific tasks before applying them.”

FMI: www.blackcombhelicopters.com

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC