AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Sep 22, 2017

AD: Airbus Airplanes

AD NUMBER: 2017-19-12

PRODUCT: All Airbus Model A300 series airplanes; Airbus Model A300 B4-600, B4-600R, and F4-600R series airplanes, and Model A300 C4-605R Variant F airplanes (collectively called Model A300-600 series airplanes); and Airbus Model A310 series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2014-13-17, which applied to the aircraft listed above.

AD 2014-13-17 required repetitive functional tests of the circuit breakers for the fuel pump power supply, and replacement of certain circuit breakers.

This new AD requires installation of fuel pumps having a new standard, which terminates the repetitive functional tests. This AD was prompted by our determination that installation of a newly developed fuel pump standard will better address the unsafe condition.

COST: The FAA estimates  affects 128 airplanes of U.S. registry.

The actions required by AD 2014-13-17 and retained in this AD take about 1 work-hour per product, at an average labor rate of $85 per work-hour. Based on these figures, the estimated cost of the actions that are required by AD 2014-13-17 is $85 per product, per inspection cycle.

The FAA also estimates that it will take up to 21 work-hours per product to comply with the basic requirements of this AD. The average labor rate is $85 per work-hour. Required parts cost per product is not available. Based on these figures, the estimated  cost of this AD on U.S. operators to be up to $228,480, or up to $1,785 per product.

DATES: This AD is effective October 24, 2017.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (11.19.25): Option Approach

Option Approach An approach requested and conducted by a pilot which will result in either a touch-and-go, missed approach, low approach, stop-and-go, or full stop landing. Pilots >[...]

Aero-News: Quote of the Day (11.19.25)

"Emirates is already the world's largest Boeing 777 operator, and we are expanding our commitment to the program today with additional orders for 65 Boeing 777-9s. This is a long-t>[...]

NTSB Final Report: Sting Sport TL-2000

(Pilot) Reported That There Was A Sudden And Violent Vibration Throughout The Airplane That Lasted Several Seconds Analysis: The pilot was returning to his home airport at an altit>[...]

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC