AD: Rolls-Royce plc Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Sat, Sep 08, 2018

AD: Rolls-Royce plc Turbofan Engines

AD NUMBER: 2018-18-06

PRODUCT: All Rolls-Royce plc (RR) RB211-Trent 970-84, RB211-Trent 970B-84, RB211-Trent 972-84, RB211-Trent 972B-84, RB211-Trent 977-84, RB211-Trent 977B-84, and RB211-Trent 980-84 turbofan engines.

ACTION: Final Rule; request for comments.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2013-02-04 for the engines listed above.

AD 2013- 02-04 required on-wing inspections of low-pressure turbine (LPT) disk seal fins and interstage seals when post-flight review indicates Engine Health Monitoring (EHM) vibratory maintenance-alert limits were exceeded in flight.

This AD requires additional criteria for the inspection of the stage 2, 3, and 4 LPT disk seal fins and interstage seals and removes the requirement to inspect the stage 5 LPT disk seal fins and interstage seal.

This AD was prompted by a Trent 900 engine experiencing increased low-pressure rotor vibration while in flight resulting in an in-flight shutdown (IFSD) and air turnback.

DATES: This AD is effective September 20, 2018. Comments must be received by October 22, 2018.

COST: The FAA estimates that this AD affects 0 engines installed on airplanes of U.S. registry. The cost of compliance is estimated as follows:
Inspection of LPT disk seal fins and interstage seals 8 work-hours × $85 per hour = $680 per engine.

FMI: AD

 


Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC