AD: Airbus Helicopters Deutschland Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Feb 22, 2019

AD: Airbus Helicopters Deutschland Helicopters

AD NUMBER: 2014–05–06 R2

PRODUCT: Airbus Helicopters Deutschland GmbH (type certificate previously held by Eurocopter Deutschland GmbH) Model EC135 and MBB-BK 117 C-2 helicopters.

ACTION: Final rule; request for comments; removal.

SUMMARY: The FAA is removing Airworthiness Directive (AD) 2014-05-06 R1, which applied to the aircraft listed above.

AD 2014-05-06 R1 required installing bushings and washers on the flight controls. This action is prompted by an error in the issuance of 2014-05-06 R1. Accordingly, AD 2014-05-06 R1 is removed.

DATES: This AD becomes effective February 19, 2019. Comments must be received by April 22, 2019.

After AD 2014-05-06 R1 was published, the FAA realized that the amendatory language is in error. Although, as published, AD 2014-05-06 R1 stated it replaced AD 2014-05-06, the FAA previously removed AD 2014-05-06 when AD 2017-03-01, Amendment 39-18792 (82 FR 11502, February 24, 2017) (AD 2017-03-01) was issued.

AD 2017-03-01 contains the same requirements as AD 2014-05-06, including the repetitive inspections, but corrected an error in the compliance time. Instead of issuing AD 2014-05-06 R1, the FAA says a new AD should have been issued to change the repetitive inspections by replacing AD 2017-03-01.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (11.19.25): Option Approach

Option Approach An approach requested and conducted by a pilot which will result in either a touch-and-go, missed approach, low approach, stop-and-go, or full stop landing. Pilots >[...]

Aero-News: Quote of the Day (11.19.25)

"Emirates is already the world's largest Boeing 777 operator, and we are expanding our commitment to the program today with additional orders for 65 Boeing 777-9s. This is a long-t>[...]

NTSB Final Report: Sting Sport TL-2000

(Pilot) Reported That There Was A Sudden And Violent Vibration Throughout The Airplane That Lasted Several Seconds Analysis: The pilot was returning to his home airport at an altit>[...]

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC