Bell’s Tiltrotor Assault Aircraft Becomes Program of Record | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Wed, Aug 07, 2024

Bell’s Tiltrotor Assault Aircraft Becomes Program of Record

Army Approves Milestone B Decision

Bell Textron announced the U.S. Army has approved the Milestone B decision for its Future Long Range Assault Aircraft (FLRAA), signifying the start of the weapon system’s Program of Record (PoR).

The Milestone B decision is an element of the Major Capability Acquisition process and results from years of the Bell team and the U.S. Army working together to develop requirements, reduce risk, and includes ensuring the integration and effectiveness of the aircraft’s design, sustainment, and system integrations critical to the Army’s special mission requirements.

The goal of the U.S. Army’s new long range assault aircraft is to fly twice as far and twice as fast as the current fleet. The use of tiltrotor technology, an open architecture, and digital engineering promise to make it the most reliable, affordable, and high-performing long-range assault aircraft in the world.

In response to the U.S. Army’s contract award in 2022, Bell established new state-of-the-art facilities and innovative manufacturing processes to drive cost and performance to execute the program. Next phases will be to continue to mature the design and prototyping.

Col. Jeffrey Poquette, FLRAA Project Manager said “This significant milestone is made possible by the years of hard work and sacrifice by Team FLRAA and our teammates throughout the Army and the Department of Defense. We are poised to deliver a truly transformational aircraft for the Army. The hard work continues into the Engineering and Manufacturing Development Phase where we will design, build and test FLRAA prototypes. It is certainly an exciting time for the program.”

Ryan Ehinger, Bell’s Senior Vice President and Program Director, FLRAA program said, "This achievement marks a historic moment for both the U.S. Army and Bell. Now that the program has Milestone B approval, the course is set for delivering transformational capability to the warfighter. The FLRAA team remains laser-focused on working in tandem with the U.S. Army to execute the next phase of Engineering and Manufacturing Development (EMD).”

FMI:  news.bellflight.com/         

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

ANN's Daily Aero-Linx (07.03.25)

Aero Linx: Colorado Pilots Association (CPA) Colorado Pilots Association was incorporated as a Colorado Nonprofit Corporation in 1972. It is a statewide organization with over 700 >[...]

ANN's Daily Aero-Term (07.03.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC