Boeing Flies Third 787-9 Dreamliner | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Nov 21, 2013

Boeing Flies Third 787-9 Dreamliner

First Genx-Powered Airplane Flies Some Two Months After Inaugural 787-9 Flight

Boeing's third 787-9 Dreamliner, the first to be powered by General Electric GEnx engines. The third of three 787-9s dedicated to the test effort, ZB021 joined the fleet some two months from the inaugural flight of the first 787-9.

ZB021 took off from Paine Field in Everett, WA, at 1215 PST and landed 2 hours and 44 minutes later at Seattle's Boeing Field. Boeing will use ZB021 to test engine performance as well as airplane handling characteristics such as low-speed performance and braking.

The 787-9 test program continues to make great progress. The fleet flies regularly, with the second airplane now in Florida for climatic testing, and has accumulated more than 180 flight hours and more than 60 flights. In addition to the three dedicated airplanes, Boeing also will conduct some testing on two production airplanes, the first of which is in final assembly in Everett. 787-10 development also is on plan.

Boeing is on track to deliver the 787-9 to launch customer Air New Zealand in mid-2014. 26 customers have ordered 396 787-9s, accounting for approximately 40 percent of all 787 orders.

(Image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC