AD: Bombardier, Inc., Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Aug 23, 2018

AD: Bombardier, Inc., Airplanes

AD NUMBER: 2018-17-0

PRODUCT: Certain Bombardier, Inc., Model DHC-8-400 series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2014-05-28, which applied to aircraft listed above.

AD 2014-05-28 required revising the maintenance or inspection program, as applicable.

This AD requires revising the maintenance or inspection program, as applicable, to include a revised task. This AD was prompted by a determination that the interval from Maintenance Review Board (MRB) task number 323100-202 should not be escalated, and that Certification Maintenance Requirements (CMR) task number 323100-102 should be applicable to all Model DHC-8-400 series airplanes, regardless of which main landing gear (MLG) up-lock assembly is installed.

DATES: This AD is effective September 25, 2018.

COST: The FAA estimates that this AD affects 69 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Revising the maintenance or inspection program takes an average of 90 work-hours per operator, although this number may vary from operator to operator. In the past, the FAA has estimated that this action takes 1 work-hour per airplane. Since operators incorporate maintenance or inspection program changes for their affected fleet(s), the FAA has determined that a per-operator estimate is more accurate than a per-airplane estimate. Therefore, total cost per operator is estimated to be $7,650 (90 work-hours x $85 per work-hour).
FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

ANN's Daily Aero-Linx (11.20.25)

Aero Linx: Glenn H. Curtiss Museum The Glenn H. Curtiss Museum, bearing the name of Hammondsport’s favorite son, is located on State Route 54, one half mile south of the vill>[...]

NTSB Prelim: Just Highlander

The Flight Instructor Noticed Some Engine Roughness And Diverted Toward Westwinds Airport On November 2, 2025, about 1630 mountain standard time, an experimental amateur-built Just>[...]

Classic Aero-TV: Just Like The 'Real' Thing – Redbird/Disney’s ‘Dusty’ FlightSim

From 2014 (YouTube Edition) -- Disclaimer: No Matter What He Tells You, Tom Is Not A Certified Firefighting Pilot While at EAA AirVenture 2014, ANN News Editor, Tom Patton checked >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC