Northrop Grumman UAV Completes Critical Design Review | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Dec 03, 2005

Northrop Grumman UAV Completes Critical Design Review

Scheduled To Fly By End Of 2006

Northrop Grumman Corporation tells Aero-News the company has successfully conducted a critical design review of its MQ-8B Fire Scout unmanned aerial vehicle (UAV) for the US Navy.  The review moves the program closer to full-scale production and delivery of the vertical takeoff and landing (VTOL) UAV to the Navy.

"The teamwork shown by the integrated US Navy and Northrop Grumman program team resulted in an excellent and well-coordinated design review," said Cmdr. Rob Murphy, the Navy's team lead for the Fire Scout program. "The long hours of preparation really paid off."

The review brought together the Northrop Grumman Fire Scout team, the Navy and U.S. Army program teams, Navy representatives for Littoral Combat Ship integration and members of the Army's Future Combat System program. Both services have been closely involved in the design to maximize commonality across the Fire Scout platforms.

The technical review process covered every aspect of the UAV to ensure it meets all current and future requirements. Specifically, the review included air-vehicle design, avionics and payload architecture, communications and data links, ship- and land-based launch and recovery and the ability to integrate future payloads onto the aircraft.

"Working with our Navy counterparts, the Fire Scout program continues to mature into a capable and supportable asset for the warfighter," said Doug Fronius, Northrop Grumman's program director for the Navy Fire Scout.
 
Final assembly of the Fire Scout air vehicles will take place at Northrop Grumman's new manufacturing facility in Moss Point, MS. The first airframe is scheduled to arrive there in January from Schweizer Aircraft Corp., a major supplier.

Following assembly, ground testing and first flight are scheduled to be completed in late 2006.

FMI: www.northropgrumman.com

Advertisement

More News

ANN's Daily Aero-Term (11.29.25): Waypoint

Waypoint A predetermined geographical position used for route/instrument approach definition, progress reports, published VFR routes, visual reporting points or points for transiti>[...]

ANN's Daily Aero-Linx (11.29.25)

Aero Linx: Sentimental Journey to Cub Haven Sentimental Journey Flyin began in 1986 with a group of dedicated volunteers working to provide a sentimental return to Lock Haven, the >[...]

NTSB Prelim: Jabiru USA Sport Aircraft LLC J230-SP

The Pilot Would Often Fly Over Their House At A Low Altitude And That Family Members Would Go Outside To Wave On November 14, 2025, at 1708 eastern standard time, a Jabiru USA Spor>[...]

Classic Aero-TV: Crafting The Future of eVTOL Infrastructure

From 2024 (YouTube Edition): Volatus Infrastructure Paves The Way The name “Volatus” seems to be everywhere these days, popping up in a series of partnerships and proje>[...]

Klyde Morris (11.28.25)

Fortnite Conquers All, Klyde FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC