Northrop Grumman UAV Completes Critical Design Review | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sat, Dec 03, 2005

Northrop Grumman UAV Completes Critical Design Review

Scheduled To Fly By End Of 2006

Northrop Grumman Corporation tells Aero-News the company has successfully conducted a critical design review of its MQ-8B Fire Scout unmanned aerial vehicle (UAV) for the US Navy.  The review moves the program closer to full-scale production and delivery of the vertical takeoff and landing (VTOL) UAV to the Navy.

"The teamwork shown by the integrated US Navy and Northrop Grumman program team resulted in an excellent and well-coordinated design review," said Cmdr. Rob Murphy, the Navy's team lead for the Fire Scout program. "The long hours of preparation really paid off."

The review brought together the Northrop Grumman Fire Scout team, the Navy and U.S. Army program teams, Navy representatives for Littoral Combat Ship integration and members of the Army's Future Combat System program. Both services have been closely involved in the design to maximize commonality across the Fire Scout platforms.

The technical review process covered every aspect of the UAV to ensure it meets all current and future requirements. Specifically, the review included air-vehicle design, avionics and payload architecture, communications and data links, ship- and land-based launch and recovery and the ability to integrate future payloads onto the aircraft.

"Working with our Navy counterparts, the Fire Scout program continues to mature into a capable and supportable asset for the warfighter," said Doug Fronius, Northrop Grumman's program director for the Navy Fire Scout.
 
Final assembly of the Fire Scout air vehicles will take place at Northrop Grumman's new manufacturing facility in Moss Point, MS. The first airframe is scheduled to arrive there in January from Schweizer Aircraft Corp., a major supplier.

Following assembly, ground testing and first flight are scheduled to be completed in late 2006.

FMI: www.northropgrumman.com

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC