AD: Turbomeca S.A. Turboshaft Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Apr 22, 2012

AD: Turbomeca S.A. Turboshaft Engines

AD NUMBER: 2012-07-09

PRODUCT: Turbomeca S.A. Arrius 2F turboshaft engines with P3 air pipe (first section) part number (P/N) 0 319 71 918 0, installed.
SUBJECT: Airworthiness Directive 2012-07-09
ACTION: Final Rule

SUMMARY: The FAA is superseding an existing airworthiness directive (AD) for Turbomeca S.A. Arrius 2F turboshaft engines with P3 air pipe (first section) part number (P/N) 0 319 71 918 0,installed. That AD currently requires inspections of the P3 air pipe (first section) and right-hand (RH) rear half-wall for proper clearance and readjustment of the pipe if necessary. This new AD requires the same inspections for installed engines, eliminates readjusting of the P3 air pipe (first section), requires replacement of the RH rear half-wall under certain conditions, and adds an optional terminating action.

This AD was prompted by Turbomeca determining that the clearance between the P3 air pipe (first section) and the RH rear half-wall might change during installation of the engine on the helicopter.

The FAA is issuing this AD to prevent an uncommanded power loss to flight idle, which could result in an emergency autorotation landing or accident.

DATES: This AD is effective May 24, 2012.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (11.19.25): Option Approach

Option Approach An approach requested and conducted by a pilot which will result in either a touch-and-go, missed approach, low approach, stop-and-go, or full stop landing. Pilots >[...]

Aero-News: Quote of the Day (11.19.25)

"Emirates is already the world's largest Boeing 777 operator, and we are expanding our commitment to the program today with additional orders for 65 Boeing 777-9s. This is a long-t>[...]

NTSB Final Report: Sting Sport TL-2000

(Pilot) Reported That There Was A Sudden And Violent Vibration Throughout The Airplane That Lasted Several Seconds Analysis: The pilot was returning to his home airport at an altit>[...]

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC