NASA Awards Contract to Modify Kennedy's Vehicle Assembly Building High Bay 3 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Mar 07, 2014

NASA Awards Contract to Modify Kennedy's Vehicle Assembly Building High Bay 3

Florida Company Will Help Ready The Facility For SLS Assembly

NASA has selected Hensel Phelps Construction Co., of Orlando, FL, to modify High Bay 3 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida for the processing of the agency's Space Launch System (SLS) rocket.

Hensel Phelps will receive a fixed-price contract for $99.57 million, consisting of the base amount and three options. The period of performance is 782 calendar days, or about 2 years and one month. The potential maximum value of this contract is $112.70 million, if additional awarded options are exercised.

Contract services include all required management, labor, facilities, materials and equipment, other than government furnished equipment, to modify the VAB and construct new vehicle access platforms and related systems for the SLS. The work consists of removing, modifying or reusing current structural component systems, and constructing and installing new structural, mechanical and electrical material, systems and equipment.

The work done on this contract will support Kennedy's Ground Systems Development and Operations (GSDO) Program. Building on five decades of launch and processing excellence, GSDO is transforming Kennedy into a multi-user spaceport capable of accommodating a wide array of government and commercial space activities.

FMI: www.nasa.gov

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

ANN's Daily Aero-Linx (07.03.25)

Aero Linx: Colorado Pilots Association (CPA) Colorado Pilots Association was incorporated as a Colorado Nonprofit Corporation in 1972. It is a statewide organization with over 700 >[...]

ANN's Daily Aero-Term (07.03.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC