First Hubble Hardware Arrives At KSC For STS-125 Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Jul 18, 2008

First Hubble Hardware Arrives At KSC For STS-125 Flight

Scheduled For October 8 Liftoff

The first major flight hardware for the fifth and final space shuttle servicing mission to NASA's Hubble Space Telescope is starting to arrive at the Kennedy Space Center, FL to begin preparations for its targeted October launch.

Three carriers, which are pallets that will hold equipment in space shuttle Atlantis' payload bay, were delivered to Kennedy Wednesday. They will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during Atlantis' mission, designated STS-125 and SM4.

The three payload carriers are the Flight Support System (FSS), the Super Lightweight Interchangeable Carrier (SLIC), and the Orbital Replacement Unit Carrier (ORUC). At the end of July, a fourth and final carrier, the Multi-Use Lightweight Equipment (MULE) carrier, will join the others in the Payload Hazardous Servicing Facility where the Hubble payload is being prepared for launch.

The Flight Support System will attach, secure and provide power to Hubble and also contains the Soft Capture Mechanism that will assist in the de-orbiting of the telescope when its science mission is over.

Among the components to be integrated onto the carriers are the Wide Field Camera 3 that will be placed on the SLIC with Hubble's two new battery modules. The Fine Guidance Sensor and the Cosmic Origins Spectrograph will be on the ORUC, as well as the replacement gyros.

The Relative Navigation Sensors and the New Outer Blanket Layers will be on the MULE. These components, which will be integrated onto the carriers, will be delivered to Kennedy during the first half of August.

Numerous crew aids and tools that the astronauts will use during their five planned spacewalks also will be integrated onto the carriers. The new hardware will ensure Hubble is at the apex of its scientific capability and that it functions efficiently for a minimum of five more years.

The processing and integration of the Hubble flight hardware will take approximately two months. The payload is scheduled to go to Launch Pad 39A in mid-September to be installed into Atlantis' payload bay.

Atlantis is targeted to launch October 8 at 0134 EDT.

FMI: www.nasa.gov/hubble

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC