VEM Receives Airbus Certification For A310 Rudder Repairs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Dec 30, 2008

VEM Receives Airbus Certification For A310 Rudder Repairs

Assemblies Susceptible To Delamination

VEM Maintenance & Engineering has been chosen by Airbus as its only Authorized Repair Center in Latin America to overhaul the composite rudder assemblies of the Airbus A310 fleet.

The Brazilian company notes it already holds all major certifications in both airplane and component maintenance.

Airbus says VEM's technical capacity was the determining factor for the company to be chosen and certified. Another positive point was VEM's "White Room" (a chamber with environmental control: temperature, relative humidity, and suspended particles), which can hold the rudder of the A310, and meets all of Airbus' control standards.

The course was held from October 20-31 at Airbus' facilities in Stade, Germany. VEM sent a team of three members (technicians/engineers), from the Composite Structures Area, to take the training and then to multiply it within the company.

The course focused on theoretical and practical aspects of the construction and repair concept of the A310 rudder, including key parts of the process, such as delamination and disbonds caused by the moisture entrapment... defects that reduce the structural integrity of these components (shown above).

"Besides the importance of this certification for VEM's portfolio of services, it was also important for the growth of the team," comments Structural Engineer Rodrigo Gaya. "Airbus presented to us the techniques developed over the past five years, so that the same quality assured by Airbus is assured by its Authorized Repair Centers. It was gratifying to hear commented by Airbus' technical team and by Project Manager Olaf Rokitta that VEM obtained the best results in the entire history of this training, which took place on the ninth day of testing."

FMI: www.vem.aero/, www.airbus.com

Advertisement

More News

Classic Aero-TV: Extra; the Airplane, the Man, and His Grand DeLand Plan

From 2023 (YouTube Edition): Germany’s Best by Way of Florida Established in 1980 by German aerobatic pilot Walter Extra as a means by which to design and develop his own air>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

Aero-News: Quote of the Day (11.27.25)

“Achieving PMA for the S-1200 Series magnetos is another step in expanding our commitment to providing the aviation community with the most trusted and durable ‘firewal>[...]

ANN's Daily Aero-Term (11.27.25): Ultralight Vehicle

Ultralight Vehicle A single-occupant aeronautical vehicle operated for sport or recreational purposes which does not require FAA registration, an airworthiness certificate, or pilo>[...]

ANN's Daily Aero-Linx (11.27.25)

Aero Linx: The de Havilland Moth Club Ltd The de Havilland Moth Club evolved from a belief that an association of owners and operators of Moth aeroplanes should be formed to create>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC