Ariane 5 Launcher Initial Assembly Completed In French Guiana | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Mon, Jun 18, 2012

Ariane 5 Launcher Initial Assembly Completed In French Guiana

Booster For The 4th Planned Launch This Year

Initial assembly of the fourth Ariane 5 for launch by Arianespace in 2012 has been completed at the Spaceport in French Guiana, marking a new milestone in preparations for a mission to loft a dual-passenger payload later in the year. The heavy-lift Ariane 5 ECA version is located in the Launcher Integration Building, where it took shape during a multi-step process that began with positioning of the vehicle’s cryogenic core stage over the mobile launch table. The two solid propellant boosters were then mated to the core stage, followed by a “topping off” installation of the cryogenic upper stage and vehicle equipment bay – which were pre-integrated as a single component.

This is the 64th Ariane 5 to take shape at the Spaceport, and will continue the cadence with Arianespace’s workhorse launcher. Designated as Flight VA208 in reference to the 208th flight of an Ariane family vehicle, the launcher is to carry a two-passenger commercial telecommunications satellite payload – the primary mission application for Ariane 5.
 
The launch will follow Arianespace’s next Ariane 5 flight (VA207), scheduled to lift off on July 5 with the EchoStar XVII high-throughput relay platform for Hughes Network Systems, and the MSG-3 meteorological spacecraft for EUMETSAT (the European Organization for the Exploitation of Meteorological Satellites).
 
The VA207 flight’s Ariane 5 currently is in the Spaceport’s Final Assembly Building, ready for integration of the EchoStar XVII and MSG-3 satellites. (Image provided by Arianespace)

FMI: www.arianespace.com

Advertisement

More News

NTSB Prelim: Lee Aviation LLC JA30 SuperStol

A Puff Of Smoke Came Out From The Top Of The Engine Cowling Followed By A Total Loss Of Engine Power On May 9, 2025, about 1020 mountain daylight time, an experimental amateur-buil>[...]

Classic Aero-TV: Curtiss Jenny Build Wows AirVenture Crowds

From 2022 (YouTube Edition): Jenny, I’ve Got Your Number... Among the magnificent antique aircraft on display at EAA’s AirVenture 2022 was a 1918 Curtiss Jenny painstak>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Classic Aero-TV: Quest Kodiak Enhances Migration Monitoring Programs

From 2008 (YouTube Edition): US Fish and Wildlife Service Chooses The Kodiak To Monitor Waterfowl Populations Waterfowl all over North America may soon have to get used to a new ab>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC