Fatigue Crack In Engine Led To 2015 Las Vegas Fire | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Jun 26, 2018

Fatigue Crack In Engine Led To 2015 Las Vegas Fire

Engine Caught Fire On Takeoff Roll From Las Vegas' McCarran Airport

A 2015 engine fire on a British Airways 777-236ER was caused by a fatigue crack in the high-pressure compressor stage 8 disk web and subsequent uncontained engine failure, which led to the detachment of the main fuel supply line, according to the NTSB's probable cause report released last week.

The September 8, 2015 fire occurred during the takeoff roll at McCarran International Airport in Las Vegas. Two seconds after hearing a “bang,” the captain aborted the takeoff, and the jetliner came to a stop on the runway 13 seconds later. The 157 passengers, including one lap child, and 13 crewmembers evacuated via emergency slides. The flight’s destination was London-Gatwick Airport.

The captain ordered passengers to evacuate from the right side of the airplane. But the NTSB found that the unaffected right engine continued to run for 43 seconds after the captain’s order, resulting in jet blast blowing two emergency slides out of position and rendering them unusable for the evacuation. The passengers and crew were able to use two of the eight doors to leave the airplane before smoke and fire encroached the fuselage.

The NTSB found that the captain did not use his quick reference handbook to read and do checklist items. It was only when a third pilot in the cockpit noticed instruments indicating the right engine was still running that the engine was shut down. “Because the captain did not follow standard procedures, his call for the evacuation checklist and the shutdown of the right engine were delayed,” the report said.

The high-pressure compressor stage 8-10 spool in the left engine, one of two GE GE90-85BG11 engines on the airplane, had accumulated 11,459 total cycles. Investigators found that the crack initiated after about 6,000 cycles, much earlier than the engine’s manufacturer, GE, predicted; the cause of the crack initiation could not be identified. There were no additional cracks found on the disk during a post-accident inspection of the engine.

The disk web was not an area that either the Federal Aviation Administration or the manufacturer required to be inspected, so the crack went undetected. During maintenance in September 2008, when the high-pressure compressor was removed from the engine and disassembled, exposing the stage 8-10 spool, the surface crack length would have been about 0.05 inches. “If the disk web had been required to be inspected during this maintenance, the crack should have been detectable,” the report said. The lack of inspection procedures for the stage 8 disk contributed to the accident, the NTSB found. After the accident, GE implemented inspection procedures designed to detect disk web cracks.

(Image provided with NTSB news release)

FMI: Probable Cause report

Advertisement

More News

Classic Aero-TV: Pure Aerial Precision - The Snowbirds at AirVenture 2016

From 2016 (YouTube Edition): The Canadian Forces Snowbirds Can Best Be Described As ‘Elegant’… EAA AirVenture 2016 was a great show and, in no small part, it was>[...]

NTSB Final Report: Costruzioni Aeronautiche Tecna P2012 Traveller

Airplane Lunged Forward When It Was Stuck From Behind By A Tug That Was Towing An Unoccupied Airliner Analysis: At the conclusion of the air taxi flight, the flight crew were taxii>[...]

ANN's Daily Aero-Linx (11.23.25)

Aero Linx: International Stinson Club So you want to buy a Stinson. Well the Stinson is a GREAT value aircraft. The goal of the International Stinson Club is to preserve informatio>[...]

ANN's Daily Aero-Term (11.23.25): Request Full Route Clearance

Request Full Route Clearance Used by pilots to request that the entire route of flight be read verbatim in an ATC clearance. Such request should be made to preclude receiving an AT>[...]

Aero-News: Quote of the Day (11.23.25)

"Today's battlefield is adapting rapidly. By teaching our soldiers to understand how drones work and are built, we are giving them the skills to think creatively and apply emerging>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC