NASA Announces Senior Leadership Changes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Sep 26, 2012

NASA Announces Senior Leadership Changes

Three To Assume New Posts Immediately

NASA Administrator Charles Bolden announced three changes to his senior leadership team Tuesday. Robert Lightfoot, acting associate administrator at NASA Headquarters in Washington, will assume that role on a permanent basis. Patrick Scheuermann, director of NASA's John C. Stennis Space Center near Bay St. Louis, Miss., will become director of NASA's Marshall Space Flight Center in Huntsville, Ala. Scheuermann, will replace Robin Henderson, who has filled the position on a temporary basis since Gene Goldman's retirement Aug. 3. Lightfoot began his assignment as acting associate administrator March 5.

Scheuermann's successor as the Stennis director is Dr. Richard J. Gilbrech, who currently serves as that center's deputy director. All three management changes are effective immediately.

"Robert, Patrick and Rick are three of NASA's finest public servants who will continue to play key roles in our agency's future," NASA Administrator Charles Bolden said. "America is fortunate to have three such talented leaders assuming these important jobs at a pivotal time for NASA and space exploration."

As associate administrator, Lightfoot is the agency's highest-ranking civil servant, responsible for oversight and integration of NASA's broad efforts in human space flight, science and aeronautics. Lightfoot began his NASA career as a test engineer and manager for the space shuttle main engine technology test bed program. He then served in leadership positions at Marshall, Stennis and Headquarters. From 2003 to 2005, he was assistant associate administrator for the Space Shuttle Program, Office of Space Flight, at Headquarters.

Scheuermann has provided executive leadership, overall direction and management of Stennis since being named that center's director in 2010. He is responsible for implementing NASA's mission in the area of rocket propulsion testing, and developing and maintaining NASA's world-class rocket propulsion test facilities.

Scheuermann previously served as Stennis' deputy director and associate director, in addition to working as chief operating officer of NASA's Michoud Assembly Facility in New Orleans. Since joining NASA in 1988 as a propulsion test engineer, he worked on numerous major test projects at Stennis, including serving as project manager for NASA's Reusable Launch Vehicle program, a NASA-industry effort to develop a new generation of safe and cost-effective rockets to send payloads to space.

Gilbrech has served as Stennis' deputy director since 2010. He began his NASA career in 1991 at Stennis in the area of propulsion test technology. From 1998 to 2000, he served as chief of the Propulsion Test Engineering Division at Stennis, and in 2003, he was named manager of the Propulsion Integration Office, responsible for managing NASA's rocket propulsion test facilities.

Later in 2003, Gilbrech relocated to Langley Research Center in Hampton, Va., to become a principal engineer in the NASA Engineering and Safety Center. He later served as deputy of the NASA Engineering and Safety Center and as deputy director of Langley. In 2006, Gilbrech was named director of Stennis, serving in that role until assuming leadership of NASA's Exploration Systems Mission Directorate at Headquarters in Washington.

All three men are highly honored NASA leaders, earning the Presidential Rank Award of Meritorious Executive and agency medals for outstanding leadership.

FMI: www.nasa.gov

Advertisement

More News

Classic Aero-TV: Pure Aerial Precision - The Snowbirds at AirVenture 2016

From 2016 (YouTube Edition): The Canadian Forces Snowbirds Can Best Be Described As ‘Elegant’… EAA AirVenture 2016 was a great show and, in no small part, it was>[...]

NTSB Final Report: Costruzioni Aeronautiche Tecna P2012 Traveller

Airplane Lunged Forward When It Was Stuck From Behind By A Tug That Was Towing An Unoccupied Airliner Analysis: At the conclusion of the air taxi flight, the flight crew were taxii>[...]

ANN's Daily Aero-Linx (11.23.25)

Aero Linx: International Stinson Club So you want to buy a Stinson. Well the Stinson is a GREAT value aircraft. The goal of the International Stinson Club is to preserve informatio>[...]

ANN's Daily Aero-Term (11.23.25): Request Full Route Clearance

Request Full Route Clearance Used by pilots to request that the entire route of flight be read verbatim in an ATC clearance. Such request should be made to preclude receiving an AT>[...]

Aero-News: Quote of the Day (11.23.25)

"Today's battlefield is adapting rapidly. By teaching our soldiers to understand how drones work and are built, we are giving them the skills to think creatively and apply emerging>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC