Despite Successful Test, No New Funding For Airborne Laser | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Feb 21, 2010

Despite Successful Test, No New Funding For Airborne Laser

Program Was Cut Last Year

The Pentagon has no plans to restore funding for Boeing's airborne laser program, despite a successful test of the system February 11th. Defense Secretary Robert Gates had slashed the program from seven planes to one, cutting $8.2 billion from the 16-year-old program.

The system is designed to stop short-range missiles during their "boost phase". Missile defense advocates and at least one member of Congress, Representative Todd Tiahrt (R-KS) have asked Gates to again expand the program.

Suburban Chicago's Daily Herald reports that Pentagon spokesman Geoff Morrell said Gates is not opposed to the laser technology, but doesn't like that getting a shot requires a 747 to "hover" in enemy territory. "We still very much want to pursue development of this promising technology, and we'll figure out down the road what the appropriate and cost-effective platform is," Morrell said.

In a speech July 16th, Gates said that the program had not demonstrated its military value after more than a decade of research and development. He cited the modified 747's at $1.5 billion each, and the millions in annual maintenance costs, as the primary reasons for largely scrapping the program. "The program and operating concept were fatally flawed," Gates said.

FMI: www.dod.mil

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC