New Tower And Spaceport Shell Planned At Jacksonville, FL's Cecil Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Tue, Sep 11, 2018

New Tower And Spaceport Shell Planned At Jacksonville, FL's Cecil Airport

Jacksonville Aviation Authority Has Applied For Permits For The New Facilities

The Jacksonville (FL) Aviation Authority (JAA) plans an air traffic control tower and spaceport shell for Cecil Spaceport at the repurposed Navy Master Jet Base.

The JAA has applied for permits totalling $8.1 million for construction of the new facilities, which would include office space, a conference room and spaceport shell on the ground floor. Above that would be a control tower reaching nearly 119 feet into the air with an octagonal cab offering 360 degree views of the spaceport.

In addition, JAA has applied for a permit to make alterations and repairs to some of the existing facility, and environmental permits from the St. Johns River Water Management District.

Television station WJXT reports that the first phase of the project is planned for 45 days during which temporary structures will be built, along with traffic control devices and security fencing.

The new facility, along with its associated infrastructure, would be built over the next 472 calendar days, according to the report.

The first client for the Cecil Spaceport is Atlanta-based Generation Orbit. That company plans to initially launch small satellites using a launcher carried aloft by a modified Gulfstream jet. Their first launch is currently planned for 2019 or 2020.

The 12,500-foot runway at Cecil Spaceport is also able to accomodate returning suborbital and orbital spacecraft.

(Image from file)

FMI: Source report

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC