First Major Assembly Delivered For Sikorsky CH-53K Heavy Lift Helicopter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Sep 10, 2010

First Major Assembly Delivered For Sikorsky CH-53K Heavy Lift Helicopter

GKN Aerospace Employs Latest Design And Manufacturing Techniques

The first major structural assembly for the CH-53K heavy lift helicopter has been delivered by GKN Aerospace to Sikorsky Aircraft Corp. The CH-53K helicopter's aft transition fuselage section measures approximately 20 feet long by 9 feet wide and 9 feet high and features an advanced hybrid composite, aluminium and titanium structure covered with external composite skins.

The work is being undertaken as part of a multi-year System Design & Development (SDD) contract in which GKN Aerospace was accorded full design authority and manufacturing responsibility for the CH-53K helicopter aft transition fuselage section, cargo ramp, and overhead door structural assemblies. GKN Aerospace was awarded the contract in 2007 and will deliver seven development ship sets to Sikorsky by 2012.

Structural design was carried out by the GKN Aerospace Engineering Development Center in Nashville, TN, while manufacturing takes place at the Company's plant in St. Louis, MO. Full production of 156 ship sets is expected to commence in 2013 and continue through 2022.


Sikorsky Image

To meet demanding CH-53K helicopter program weight, durability and affordability objectives, GKN Aerospace is employing the latest design and manufacturing technologies including automated fiber placement (AFP), automated trim and drill and digital inspection. In total, more than 1,000 separate metallic and composite detailed parts per aircraft are manufactured and assembled by the GKN Aerospace team.

FMI: www.gknaerospace.com

Advertisement

More News

NTSB Final Report: Patriot Aircraft LLC CX1900A

After Draining Both Wing Fuel Tanks, A Significant Amount Of Water Was Observed In The Right Wing Fuel Tank Analysis: The pilot, who was also the owner of the experimental amateur->[...]

Aero-News: Quote of the Day (12.06.25)

“Airbus apologises for any challenges and delays caused to passengers and airlines by this event. The Company thanks its customers, the authorities, its employees and all rel>[...]

ANN's Daily Aero-Term (12.06.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

ANN's Daily Aero-Linx (12.06.25)

Aero Linx: Taylorcraft Foundation, Inc. The Taylorcraft Foundation is exclusively organized for charitable, educational & scientific activities and will preserve the history an>[...]

Airborne-NextGen 12.02.25: Honda eVTOL, Arctus High-Alt UAS, Samson Patent

Also: USAF Reaper Accident, Baikonur Damage, Horizon eVTOL IFR/FIKI, New Glenn Update Honda has outlined its clearest timeline yet for its entry into the world of electric vertical>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC