Sierra Nevada Corporation Transfers Operation Of Six Orbital Satellites | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Dec 21, 2014

Sierra Nevada Corporation Transfers Operation Of Six Orbital Satellites

ORBCOMM Begins Providing Services To Customers

The first six satellites of the ORBCOMM Generation Two (OG2) constellation, designed and built by Sierra Nevada Corporation's (SNC) Space Systems, have completed all on-orbit checkout procedures, culminating in the transfer of operations from SNC to ORBCOMM in mid-September. The six satellites have already begun providing greater network efficiency for ORBCOMM’s global customers.

The satellites, which augment the first generation ORBCOMM constellation (OG1), were launched into low-Earth orbit July 14, 2014 from Cape Canaveral Air Force Station, Florida. Derived from SNC’s SN-100 bus, the satellites are now processing over 25 percent of ORBCOMM’s Machine-to-Machine (M2M) traffic and will continue to advance network functionality once the remaining 11 satellites in the constellation are launched. SNC is preparing the next 11 satellites for launch in mid-2015.

“We are very proud to hand off orbital operations of the first satellites in the OG2 constellation to ORBCOMM,” said Paul Streit, vice president of programs for SNC’s Space Systems. “As expected, we reached our objective of transferring operations to our customer within 60 days of launch. During the two-month timeframe, we managed the deployment and checkout of six simultaneously-launched satellites, and are very pleased with the OG2 satellites’ performance improvements thus far. Between the six spacecraft, we now have in excess of 24 months, or over 17,000 hours, of orbital operational heritage for the SN-100 bus.”

As the prime contractor and spacecraft bus manufacturer for this upgraded communication constellation, SNC was responsible for the design, development, integration and launch management of the satellites. SNC provided launch support, management and satellite checkout operations from its Louisville Satellite Operation Center (LSOC) in Louisville, Colorado. Both SNC’s LSOC and ORBCOMM’s control center in Sterling, Virginia were seamlessly interconnected, allowing for efficient initial operations and in-orbit testing.

“It is a testament to the strength of our combined ORBCOMM/SNC team to orchestrate a complex checkout of six satellites simultaneously from two geographically dispersed control centers,” said John Stolte, ORBCOMM’s executive vice president of technology and operations. “It’s a great confidence builder for an even more impactful 2015 launch of the remaining 11 spacecraft.”

(Image provided by Sierra Nevada Corp)

FMI: www.sncorp.com

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC