AD: DG Flugzeugbau GmbH Gliders | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Jun 28, 2017

AD: DG Flugzeugbau GmbH Gliders

AD NUMBER: 2017-13-06

PRODUCT: All DG Flugzeugbau GmbH Models DG-400, DG-500M, DG-500MB, DG-800A, and DG-800B gliders.

ACTION: Final Rule.

SUMMARY:  This AD results from mandatory continuing airworthiness information (MCAI) issued by an aviation authority of another country to identify and correct an unsafe condition on an aviation product.

The MCAI describes the unsafe condition as a manufacturing defect in certain textile fabric covered fuel hoses, which could cause the fuel hose to fail.

During service and annual inspection, DG found that some fuel hoses with textile fabric covering, installed from the beginning of the year 2015, had become weak or untight with time. The suspected root cause for this premature degradation is a manufacturing defect of a certain batch of fuel hoses.

This condition, if not detected and corrected, may lead to kinking of the fuel hoses, possibly resulting in a reduced fuel supply and consequent partial or total loss of available power.

The FAA estimates that this AD will affect 59 products of U.S. registry. It also estimates that it will take about 2 work-hours per product to comply with each inspection required by this AD. The average labor rate is $85 per work-hour.

Based on these figures, the inspection cost of this AD on U.S. operators is estimated to be $10,030, or $170 per product.

DATES: This AD is effective July 31, 2017.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (11.25.25)

Aero Linx: Vintage Sailplane Association The purpose of the Vintage Sailplane Association (VSA) is to promote the acquisition, restoration and flying of vintage sailplanes by its m>[...]

NTSB Final Report: Glasair GlaStar

Smoke Began Entering The Cockpit During The Landing Flare, And Then The Pilot Noticed Flames... Analysis: The pilot reported that about 30 minutes into the local flight, he heard s>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: Red Tail Project Update – Taking the Mission to the People

From 2010 (YouTube Edition): The Red Tail Project Continues Effort Towards ‘Rise Above Program’ The Red Tail Project is a true example of this unbreakable spirit. In 20>[...]

Airborne 11.24.25: ANN's 30th!, Starship’s V3 Booster Boom, Earhart Records

Also: 1st-Ever Space Crime Was a Fraud, IAE Buys Diamonds, Kennon Bows Out, Perseverance Rover An interesting moment came about this past Sunday as ANN CEO, Jim Campbell, noted tha>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC