Boeing Says Report Of ANOTHER 787 Problem Untrue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Apr 21, 2008

Boeing Says Report Of ANOTHER 787 Problem Untrue

German Magazine Says FAA Has Delayed Certification

As if Boeing didn't have enough problems right now, placating customers peeved at delays with the 787 Dreamliner... now the American planemaker is fighting off what it says are unsubstantiated reports of yet ANOTHER problem regarding the composite-bodied airliner.

Reuters reports a German magazine published a story Sunday, saying the FAA recently told the planemaker of an issue regarding certification of the 787, which in turn would push back first deliveries by another three-to-six-months. That's on top of the latest delay, announced by Boeing earlier this month, pushing first deliveries to late 2009 -- about 15 months later than originally planned.

There's just one problem with the report by Focus magazine, Boeing says... it's not true, and the company hasn't heard differently from the FAA.

"The FAA has been overseeing our certification effort every step of the way and this is not our understanding," said Boeing spokeswoman Yvonne Leach.

FAA spokeswoman Laura Brown said she was not aware of a new delay with the Dreamliner, giving the standard response "we continue to work with Boeing on certification of the aircraft."

According to the German report, delivery of the first aircraft to 787 launch customer All Nippon Airways would be pushed to early 2010 by the latest, rumored delay.

FMI: www.boeing.com

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC