Europe's Third Automated Transfer Vehicle Begins Its Preparations For Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.03.24

Airborne-NextGen-06.04.24

Airborne-Unlimited-06.05.24 Airborne-AffordableFlyers-06.06.24

Airborne-Unlimited-06.07.24

Tue, Sep 06, 2011

Europe's Third Automated Transfer Vehicle Begins Its Preparations For Launch

Ariane 5 ISS Supply Mission Scheduled For Spring, 2012

The preparation campaign for Europe's third Automated Transfer Vehicle (ATV) has begun in French Guiana as this large cargo resupply spacecraft is readied for a spring 2012 Ariane 5 launch by Arianespace to service the International Space Station. During activity in the Spaceport's S5 payload preparation facility, the ATV's two main components - its Integrated Cargo Carrier and the Service Module - are undergoing initial checkout, starting a 180-day mission campaign.

Jules Verne ATV Docking At ISS

Both elements are in the S5 facility's large S5C hall, having been unloaded from the shipping containers that protected them during the multi-week sea voyage from Europe to South America.  S5C is the largest of the S5 building's preparation halls, and has 700 sq. meters of clean room facilities for major payloads such as the ATV.  It also includes adjacent dedicated office areas for the technical teams performing payload checkout duties.

The ATV arrived in French Guiana last week aboard the MN Toucan - one of two roll-on/roll-off seagoing vessels used by Arianespace to transport launch vehicle components from Europe to South America, and which also are made available for exceptional loads such as the ATV.

Named after Italian cosmic ray physicist Edoardo Amaldi, this latest ATV will carry about two metric tons of dry cargo, 285 kg. of water and more than three tons of propellants, based on current planning. ATV Edoardo Amaldi will be the third such resupply spacecraft launched by Arianespace for servicing of the International Space Station.  The first was ATV Jules Verne, orbited in March 2008, followed by ATV Johannes Kepler this past February.

FMI: www.arianespace.com

Advertisement

More News

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

Aero-News: Quote of the Day (06.07.24)

"From the end of April, our team embarked on a groundbreaking endeavor to help make cleanup efforts on Everest safer and more efficient. We are thrilled to share that our DJI FlyCa>[...]

ANN's Daily Aero-Term (06.07.24): Obstacle

Obstacle An existing object, object of natural growth, or terrain at a fixed geographical location or which may be expected at a fixed location within a prescribed area with refere>[...]

ANN's Daily Aero-Linx (06.07.24)

Aero Linx: Helicopter Association of Canada (HAC) Mandate: 1) To promote a political and regulatory environment that will foster a prosperous Canadian Helicopter industry; 2) To ed>[...]

Airborne 06.03.24: Rotax 915/916 SB, Starship 4 Ready?, B-17 Mementos

Also: Hubble On Pause, FedEx Pilots Picket, Nexus eVTOL, VFS Honors The Rotax folks have published a Service Bulletin after issues were noted that may affect all R915i and R916i se>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC