Endeavour Hydrogen Leak Repairs Continue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Wed, Jun 24, 2009

Endeavour Hydrogen Leak Repairs Continue

"Tanking Test" Set For Next Week

At NASA's Kennedy Space Center in Florida, teams are working to evaluate and repair a plate that attaches a gaseous hydrogen vent line to space shuttle Endeavour's external fuel tank. Hydrogen leaks in the area of the Ground Umbilical Carrier Plate, or GUCP, postponed Endeavour's launch attempts June 13 and 17, delaying its 16-day flight to the International Space Station.

The Ground Umbilical Carrier Plate platform was partially extended Monday to allow technicians to continue their ongoing engineering analysis and to verify exact measurements of the position of the plate. The explosive bolts that connect the vent line to the external tank were safely disconnected, and GUCP leak checks were performed at ambient temperatures using helium gas. No leaks were detected. Previously, the only time leaks were seen were during launch attempts when super cold hydrogen gas was being passed through the vent line.

The repairs will be confirmed by a "tanking test" within the next week, in which Endeavour's external tank will be filled with liquid hydrogen and liquid oxygen, just as it is before launch. If the repairs are successful, Endeavour's next launch attempt will be targeted for July 11 at 1939 EDT.

Today, Endeavour's astronauts will catch up on administrative work and take T-38 training jet flights from their home base at NASA's Johnson Space Center in Houston to El Paso and back.

FMI: www.nasa.gov

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC