AD: Fokker Services B.V. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Sep 21, 2018

AD: Fokker Services B.V. Airplanes

AD NUMBER: 2018-19-03

PRODUCT: Certain Fokker Services B.V. Model F28 Mark 0070 and 0100 airplanes.

ACTION: Final Rule.

SUMMARY: This AD was prompted by a report of cracks, in various directions, in the lower portion of a main landing gear (MLG) piston.

This AD requires a detailed visual inspection of the MLG, and replacement if necessary.

DATES: This AD is effective October 22, 2018.

COST: The FAA estimates that this AD affects 5 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Detailed visual inspection - 3 work-hours × $85 per hour = $255 per aircraft.
  • Reporting 1 work-hour × $85 per hour = $85 per aircraft.
  • MLG Replacement (if necessary) - 12 work-hours × $85 per hour = $1,020. Parts - $95,000. Total cost per aircraft - $96,020.
FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC