EBACE 2009: Dallas Airmotive Love Field Airport RTC Expands PW305 Capability | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, May 11, 2009

EBACE 2009: Dallas Airmotive Love Field Airport RTC Expands PW305 Capability

Dallas Airmotive has expanded its PW305 capabilities at the company's Regional Turbine Center (RTC) located at Dallas Love Field Airport (DAL) in Dallas, Texas. The latest addition is the tooling and equipment to perform IBR (Integrally Bladed Rotor) replacement on the PW305A used on Learjet 60 aircraft. The first two engines to receive this replacement were completed in April.

"We knew that Pratt & Whitney Canada would introduce a new IBR for the 305A this year, so we prepared for this event last year by expanding the facility and purchasing the necessary tooling and equipment," stated Dallas Airmotive Vice President Customer Service and Global Regional Turbine Center Operations, Mike Cumnock. "As soon as the new IBR became available we were ready and have now finished our first engines with more scheduled for the rest of 2009."

Replacement of the PW305A IBR eliminates the need for inspection every 300 hours as required for the original units.

"When we received PW305 authorization from Pratt & Whitney Canada in 2004, we immediately set up the Love Field RTC for Hot Section Inspection (HSI) and quick turn service," added Cumnock.

"By doing so, our main overhaul center in Dallas could focus on major repairs and overhauls. At the RTC we've driven down Hot Section Inspection turn times to under 14 calendar days. And now, with the new equipment, we can replace the IBR separately or in conjunction with the HSI."

FMI: www.BBAAviationERO.com

Advertisement

More News

ANN's Daily Aero-Term (12.08.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

ANN's Daily Aero-Linx (12.08.25)

Aero Linx: T-34 Association, Inc. The T-34 Association was formed in July 1975 so that individuals purchasing then military surplus T-34As had an organization which would provide s>[...]

NTSB Final Report: Piper PA-31T3

As He Released The Brakes To Begin Taxiing, The Brake Pedals Went To The Floor With No Braking Action Analysis: The pilot reported that during engine start up, he applied the brake>[...]

Aero-News: Quote of the Day (12.08.25)

“Legislation like the Mental Health in Aviation Act is still imperative to hold the FAA accountable for the changes they clearly acknowledge need to be made... We cannot wait>[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC