SLS Hot Fire Test Terminated Minutes Early | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Jan 17, 2021

SLS Hot Fire Test Terminated Minutes Early

Onboard Software Acted Appropriately And Initiated A Safe Shutdown Of The Engines

Teams from NASA’s Space Launch System (SLS) Program conducted a hot fire of the Artemis I core stage on Jan. 16 at NASA’s Stennis Space Center.

What should have happened was this... Engine ignition should have started at approximately six tenths of a second before T-0, beginning with Engine 1, then Engines 3, 4, and 2 ignited in sequence a few hundredths of a second apart. The test was expected to last about 8 minutes and included three different power levels for the engines, as well as two 30-second engine gimballing, or pivoting, movements to simulate flight steering commands. Depending on the rate propellant is burned the time was estimated to range from 485 to 493 seconds to simulate launch.

But... that didn't happen.

All four RS-25 engines ignited successfully, but the test was stopped early after about a minute. At this point, the test was fully automated. During the firing, the onboard software acted appropriately and initiated a safe shutdown of the engines. During the test, the propellant tanks were pressurized, and this data will be valuable as the team plans the path forward. In coming days, engineers will continue to analyze data and will inspect the core stage and its four RS-25 engines to determine the next steps.

More info to follow...

FMI: www.nasa.gov

Advertisement

More News

NBAA Responds To GA/BA Operational Restrictions

Bolen Issues Statement Reinforcing Need To Reopen Government The National Business Aviation Association’s President and CEO issued the statement below in response to further >[...]

Boeing Deliveries Surge to Pre-Pandemic Levels

Output May Reach Its Best Since 2018 Despite Trailing Behind Airbus Boeing delivered 53 jets in October, bringing its 2025 total to 493 aircraft and marking its strongest output si>[...]

Spirit Forecasts Financial Turbulence

Low-Cost Airline Admits “Substantial Doubt” It Can Stay Airborne Spirit Airlines has once again found itself in financial trouble, this time less than a year after clai>[...]

Singapore Adds a Price Tag to Going Green

Travelers Leaving Changi Will Soon Pay for Sustainable Fuel Starting April 2026, passengers flying out of Singapore will find a new fee tucked into their tickets: a Sustainable Avi>[...]

NTSB Final Report: Arlie L Raber III Challenger 1

Pilot Was Having Difficulty Controlling The Airplane’S Rudder Pedals Due To His Physical Stature Analysis: The pilot was having difficulty controlling the airplane’s ru>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC