FAA May Drop RVSM Application Requirement For Planes With ADS-B | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Wed, Aug 09, 2017

FAA May Drop RVSM Application Requirement For Planes With ADS-B

Current Approval Process For Reduced Vertical Separation Minimum Authorization Would Remain In Place For Those Aircraft That Need It

The FAA is proposing to change the Reduced Vertical Separation Minimum (RVSM) authorization process by eliminating the need for U.S.-registered operators to apply for RVSM authorization when their aircraft meet altitude-keeping requirements and are equipped with qualified Automatic Dependent Surveillance-Broadcast (ADS-B) Out systems.

The FAA has been a major force in the implementation of RVSM since it was first introduced in 1997. RVSM reduced the vertical separation between aircraft above 29,000 feet from a minimum of 2,000 feet to 1,000 feet. This saves fuel and increases airspace capacity. RVSM airspace has now been implemented worldwide.

Currently, operators must prove their aircraft design satisfies RVSM performance requirements and that they have policies and procedures for the safe conduct of RVSM operations, before the FAA approves their RVSM authorization. Until recently, they also had to have a separate program to maintain RVSM systems and equipment. The FAA granted authorizations to operate in RVSM airspace only after finding that the pertinent requirements were met.

The proposed changes for RVSM authorizations would allow the FAA to leverage the technology in ADS-B Out systems to monitor altitude-keeping performance on RVSM-capable aircraft whenever they fly in U.S. ADS-B airspace. Properly equipped aircraft could conduct RVSM operations immediately, lowering costs and eliminating the delays associated with application processing. ADS-B becomes mandatory for aircraft operating in most U.S. airspace on January 1, 2020.

The current RVSM approval process would still be available for operators whose airplanes do not routinely operate in airspace where the FAA has sufficient ADS-B data to determine RVSM performance, or when a foreign country requires a specific approval.

(Source: FAA)

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.06.25)

Aero Linx: International Federation of Airworthiness (IFA) We aim to be the most internationally respected independent authority on the subject of Airworthiness. IFA uniquely combi>[...]

ANN's Daily Aero-Term (05.06.25): Ultrahigh Frequency (UHF)

Ultrahigh Frequency (UHF) The frequency band between 300 and 3,000 MHz. The bank of radio frequencies used for military air/ground voice communications. In some instances this may >[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

Classic Aero-TV: Virtual Reality Painting--PPG Leverages Technology for Training

From 2019 (YouTube Edition): Learning To Paint Without Getting Any On Your Hands PPG's Aerospace Coatings Academy is a tool designed to teach everything one needs to know about all>[...]

Airborne 05.02.25: Joby Crewed Milestone, Diamond Club, Canadian Pilot Insurance

Also: Sustainable Aircraft Test Put Aside, More Falcon 9 Ops, Wyoming ANG Rescue, Oreo Cookie Into Orbit Joby Aviation has reason to celebrate, recently completing its first full t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC