FAA Revises CFM International Engine AD | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, May 18, 2018

FAA Revises CFM International Engine AD

Accelerates Timeline For Initial Inspections

The FAA is mandating an accelerated timeline for the inspection of CFM56 engines of the type that suffered an uncontained engine failure on a Southwest Airlines 737. That incident led to the rapid decompression of the airplane, and the fatal injury of one of the passengers who was partially pulled out of a window of the aircraft.

According to the AD 2018-10-11, the FAA is revising the compliance time for the initial inspections of certain higher-risk fan blades mandated by AD 2018-09-10. This AD was prompted by a recent engine failure due to a fractured fan blade that resulted in the engine inlet cowl disintegrating and debris penetrating the fuselage, causing a loss of pressurization, and prompting an emergency descent.

Since AD 2018-09-10 was issued, an investigation of this event has determined new methods for identifying applicable parts as well as the need to reduce the compliance time for certain fan blades. Therefore, this AD requires inspection of higher risk fan blades, identified using one of the methods in CFM Service Bulletin (SB) CFM56-7B S/B 72-1033, Revision 01, dated May 9, 2018, within 30 days from the effective date of the AD.

The remaining fan blades must be inspected within 90 days from the effective date of the AD or prior to accumulating 20,000 flight cycles.

The AD affects an estimated 3,716 engines installed on airplanes of U.S. registry. The cost of compliance is estimated to be $170 per engine for two hours labor at $85 per hour. If repairs are required, the cost is estimated to be $8,500 per engine for parts and labor.

(Image from file)

FMI: AD

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC