NASA Bulks Up Ares V Moon Rocket | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Fri, Jun 27, 2008

NASA Bulks Up Ares V Moon Rocket

Now 20-Feet Taller, Additional Main Engine

Following a nine-month design review of the rocket that will one day return US astronauts to the moon -- and, eventually, transport them to Mars -- on Wednesday NASA unveiled a bulked-up version of its proposed Ares V rocket.

The Associated Press reports the amped-up Ares is 20 feet longer than the previous version, now standing close to 38-stories tall. The rocket's first stage now sports six main engines instead of five, and the twin solid-rocket boosters attached to the stage will also be made larger, to hold more fuel.

All the changes are intended to allow Ares to carry heavier payloads, especially as the space agency looks to the Red Planet. In the new configuration, NASA says the upgraded Ares V will be able to haul over 156,600 pounds of cargo.

"We've looked at over 1,700 different Ares concepts," Ares program manager Steve Cook said. Major work on the Ares V will begin after the current space shuttle fleet is retired in 2010, he added.

Though comparable in size and scope with the mammoth Saturn V rocket that carried astronauts to the moon in the late 1960s and early 1970s (Ares V is now about 15 feet taller), there's one fundamental difference with the Ares V: it will not carry people into orbit, just their supplies and the lunar lander. The four-man crew will ride into orbit in the Orion space capsule atop the smaller Ares I rocket, and will then rendezvous with the departure stage containing equipment launched onboard the larger rocket.

The two-step design allows more equipment to be sent to the moon or Mars.

Constellation program manager Jeff Hanley told reporters Wednesday NASA remains on track for a manned lunar mission by 2020. "This extensive review proves we are ready for the next phase: taking these concepts and moving forward," he said.

FMI: www.nasa.gov/mission_pages/constellation/main/

Advertisement

More News

Airborne 07.21.25: Nighthawk!, Hartzell Expands, Deltahawk 350HP!

Also: New Lakeland Fly-in!, Gleim's DPE, MOSAIC! Nearly three-quarters of a century in the making, EAA is excited about the future… especially with the potential of a MOSAIC>[...]

ANN's Daily Aero-Term (07.27.25): Estimated (EST)

Estimated (EST) -When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the >[...]

ANN's Daily Aero-Linx (07.27.25)

Aero Linx: Regional Airline Association (RAA) Regional airlines provide critical links connecting communities throughout North America to the national and international air transpo>[...]

NTSB Final Report: Luce Buttercup

The Airplane Broke Up In Flight And Descended To The Ground. The Debris Path Extended For About 1,435 Ft. Analysis: The pilot, who was the owner and builder of the experimental, am>[...]

Classic Aero-TV: 'That's All Brother'-Restoring a True Piece of Military History

From 2015 (YouTube version): History Comes Alive Thanks to A Magnificent CAF Effort The story of the Douglas C-47 named, “That’s all Brother,” is fascinating from>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC