Ariane 5 Launcher Initial Assembly Completed In French Guiana | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Jun 18, 2012

Ariane 5 Launcher Initial Assembly Completed In French Guiana

Booster For The 4th Planned Launch This Year

Initial assembly of the fourth Ariane 5 for launch by Arianespace in 2012 has been completed at the Spaceport in French Guiana, marking a new milestone in preparations for a mission to loft a dual-passenger payload later in the year. The heavy-lift Ariane 5 ECA version is located in the Launcher Integration Building, where it took shape during a multi-step process that began with positioning of the vehicle’s cryogenic core stage over the mobile launch table. The two solid propellant boosters were then mated to the core stage, followed by a “topping off” installation of the cryogenic upper stage and vehicle equipment bay – which were pre-integrated as a single component.

This is the 64th Ariane 5 to take shape at the Spaceport, and will continue the cadence with Arianespace’s workhorse launcher. Designated as Flight VA208 in reference to the 208th flight of an Ariane family vehicle, the launcher is to carry a two-passenger commercial telecommunications satellite payload – the primary mission application for Ariane 5.
 
The launch will follow Arianespace’s next Ariane 5 flight (VA207), scheduled to lift off on July 5 with the EchoStar XVII high-throughput relay platform for Hughes Network Systems, and the MSG-3 meteorological spacecraft for EUMETSAT (the European Organization for the Exploitation of Meteorological Satellites).
 
The VA207 flight’s Ariane 5 currently is in the Spaceport’s Final Assembly Building, ready for integration of the EchoStar XVII and MSG-3 satellites. (Image provided by Arianespace)

FMI: www.arianespace.com

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC