NASA Conducts 3rd RS-25 Engine Test Ahead of Artemis | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Sun, Dec 03, 2023

NASA Conducts 3rd RS-25 Engine Test Ahead of Artemis

Aerojet Rocketdyne Continues Work on Rocket for Lunar Return

NASA finished the 3rd of a series of 12 ground tests of the SLS rocket that will one day power Artemis program missions to the moon - and beyond.

The RS-25 engines are swinging for the fences in a change from the norm around NASA, where uncrewed, spacefaring drones became the norm. Manned missions require a lot of thrust, and the aged, handworked Saturn V was simply too difficult to recreate today without retreading significant design ground. The RS-25 will boast the best tech that they can build today, with all kinds of additive manufacturing and computer optimization allowing for futuristic improvements in weight and output (hopefully quality, too but only time will tell.) As installed, 4 engines will generate a combined 1.6 million pounds of thrust at launch, and 2 million during ascent. Artemis missions I through IV will use "modified holdover space shuttle main engines", scavenged by NASA and Aerojet Rocketdyne in a feat of thriftiness.

The 11-minute hot fire occurred on the Fred Haise Test Stand at NASA’s Stennis Space Center near Bay St. Louis, Mississippi. This one wasn't a garden variety static test, either, being used to test the engine's gimbaling techniques that will one day prove vital to control and stabilize the SLS as it reaches orbit. As part of the test, operators "also pushed the engine beyond any parameters it might experience during flight to provide a margin of operational safety." In practice, the RS-25s will fire for 500 seconds straight, while the test took one straight to 650 seconds of burn. Even better to stress-test it, the RS-25 was fired up to 113% of regular output, exceeding the "111% needed to lift SLS to orbit."

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC