Boeing Elects To Conduct Inspections On 787s Before Flight Tests Continue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sat, Jun 26, 2010

Boeing Elects To Conduct Inspections On 787s Before Flight Tests Continue

"Workmanship Issues" Identified On The Dreamliners' Horizontal Stabilizers

After some very successful initial flight testing, the Dreamliner program has been dealt a bit of a setback, as Boeing recently identified a workmanship issue with the 787's horizontal stabilizers. Some airplanes apparently have issues with improperly installed shims and the torque of associated fasteners, and Boeing says the finding requires inspection of all airplanes and rework if discrepancies are found.

The company says it has already implemented inspection and rework plan for airplanes in production. For those airplanes requiring rework, Boeing says they expect it will take up to eight days for each airplane. the company says it is not unusual for these issues to arise in the course of production programs - they are identified, dispositioned and dealt with through normal processes.

Boeing insists that reports that the fleet is "grounded" are incorrect. The company has made the decision to inspect the horizontal stabilizers on all flight test airplanes before their next flights to ensure any rework is completed as quickly as possible. Inspections are expected to take one to two days.

The Seattle Times reported that the stabilizer issue was first discovered last week. Boeing spokeswoman Yvonne Leach told that paper that the planemaker "made a decision to be prudent and do the inspections" before flying again. The improperly installed shims could have led to a "lower than expected longevity" for the joints in the horizontal stabilizer. The Italian manufacturer Alenia builds the tail assembly for Boeing.

Boeing says it expects that the issue will be addressed within the existing program schedule, and that the 787 remains on track for first delivery to ANA by the end of this year.

FMI: www.boeing.com

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC