Meltdown: Communications Failure Leads To Ground Delays Nationwide | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Tue, Aug 26, 2008

Meltdown: Communications Failure Leads To Ground Delays Nationwide

FAA Facility In Atlanta Unable To Receive Flight Plans

ANN REALTIME REPORTING 08.26.08 1600 EDT: Computer problems at a flight control center near Atlanta, GA have snagged flights nationwide, leading to widespread delays throughout the air traffic control network.

The center, located in the Atlanta suburb of Hampton, had a communication link failure in the network about 1:30 pm EDT, said FAA spokeswoman Kathleen Bergen. The center handles instrument flight plans filed for aircraft departing from airports in the eastern portion of the United States.

"As a result, all the flight plans for any instrument flights nationwide are having to be processed through a similar facility in Salt Lake City," Bergen told the Atlanta Journal-Constitution. "So that’s slowing things down."

Initially, the problem impacted transcontinental routes -- those flights requiring coordination between both centers. However, the ripple effect has since spread nationwide, affecting all flights.

Bergan stressed the problems are not affecting safety of planes already in the air, or on approach to land. However, the time lag in releasing IFR flights has led to delays as long as 90 minutes on the ground in Atlanta, as well as already-congested airports around New York City, and in Chicago.

Storms in the vicinity of several large commercial airports, including ATL, are also compounding the problems. It's possible those 90-minute delays could stretch out for hours, and likely result in cancelled flights.

ANN will continue to update this story as more information becomes available.

FMI: www.fly.faa.gov

Advertisement

More News

Airborne 07.21.25: Nighthawk!, Hartzell Expands, Deltahawk 350HP!

Also: New Lakeland Fly-in!, Gleim's DPE, MOSAIC! Nearly three-quarters of a century in the making, EAA is excited about the future… especially with the potential of a MOSAIC>[...]

ANN's Daily Aero-Term (07.27.25): Estimated (EST)

Estimated (EST) -When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the >[...]

ANN's Daily Aero-Linx (07.27.25)

Aero Linx: Regional Airline Association (RAA) Regional airlines provide critical links connecting communities throughout North America to the national and international air transpo>[...]

NTSB Final Report: Luce Buttercup

The Airplane Broke Up In Flight And Descended To The Ground. The Debris Path Extended For About 1,435 Ft. Analysis: The pilot, who was the owner and builder of the experimental, am>[...]

Classic Aero-TV: 'That's All Brother'-Restoring a True Piece of Military History

From 2015 (YouTube version): History Comes Alive Thanks to A Magnificent CAF Effort The story of the Douglas C-47 named, “That’s all Brother,” is fascinating from>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC